Tender Details
Particulars | Details |
---|---|
Title |
Under The State Plan, Reconstruction And Surface Improvement Work Of The Road Damaged Due To Excessive Flow Of Water Of Gaula River From Banbhulpura Railway Crossing To Gola Bridge Under Lalkuan Assembly Constituency Of Nainital District.
|
Description |
Under The State Plan, Reconstruction And Surface Improvement Work Of The Road Damaged Due To Excessive Flow Of Water Of Gaula River From Banbhulpura Railway Crossing To Gola Bridge Under Lalkuan Assembly Constituency Of Nainital District.
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2025_pwd_80951_1 |
Reference Number |
463/2AC, Dt- 27-02-2025 |
Tender Fee | 4720 |
EMD | 2.52 Lakh |
Tender Value | |
Place | Haldwani |
Link | https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=96540 |
Start Date | March 03, 2025 23:30 |
End Date |
17/03/2025 ( Expired 80 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and cost estimate for construction of gumdesh kayal to talladesh ramela motor length 11.00 km and 40 mtr span motor bridge over lohawati river in constituency lohaghat of district champawat under state sector
Design and cost estimate for construction of gumdesh kayal to talladesh ramela motor length 11.00 km and 40 mtr span motor bridge over lohawati river in constituency lohaghat of district champawat under state sector
Read moreImprovement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.
Improvement and asphalting work from thal satsiling motor road to rin in constituency didihat of district pithoragarh (stage-2) under the state plan.
Read moreUnder the state disaster reduction ,the necessary temporary protective work is being carried out to pr additional damage in future to the damaged road due to excessive water flow of gola river from vanbhulpura railway crossing to gola bridge in
Under the state disaster reduction ,the necessary temporary protective work is being carried out to pr additional damage in future to the damaged road due to excessive water flow of gola river from vanbhulpura railway crossing to gola bridge in
Read morePrepration of drp as per department sop for construction of saryu river with motor road at salla to pancheswar in pithoragarh assembly constituency of pithoragarh district under cm announcement 106/ 2024
Prepration of drp as per department sop for construction of saryu river with motor road at salla to pancheswar in pithoragarh assembly constituency of pithoragarh district under cm announcement 106/ 2024
Read moreWork construction of bridge on aglad river in km 1 of satagard bend to gherachak dangasari ghuttu motor road in block jaunpur constituency dhanaulti district t.g. under state sector (first phase work design drawing vetting dpr preparation etc.
Work construction of bridge on aglad river in km 1 of satagard bend to gherachak dangasari ghuttu motor road in block jaunpur constituency dhanaulti district t.g. under state sector (first phase work design drawing vetting dpr preparation etc.
Read moreConstruction work by pc in various internal roads under ward-37 of haldwani, assembly constituency of nainital district under state plan
Construction work by pc in various internal roads under ward-37 of haldwani, assembly constituency of nainital district under state plan
Read moreReconstruction and widening of the road from the lake to chamunda temple in the transit camp (remaining part of shiv nagar to transit camp main road) by thin white topping (twt) under the rudrapur assembly constituency of district udham singh nagar,
Reconstruction and widening of the road from the lake to chamunda temple in the transit camp (remaining part of shiv nagar to transit camp main road) by thin white topping (twt) under the rudrapur assembly constituency of district udham singh nagar,
Read moreRestoration of damaged road surface from caused due to underground water supply pipe laying under guwahati water supply project along roads d by l and t construction under jalukbari trd under sopd g for the year 2025 26 gr vi
Restoration of damaged road surface from caused due to underground water supply pipe laying under guwahati water supply project along roads d by l and t construction under jalukbari trd under sopd g for the year 2025 26 gr vi
Read moreConstruction of access road on nepal side (down stream) of the 110 meter double lane motor bridge under construction between india and nepal at charchhoom over kali river in dharchula assembly of pithoragarh district, under state plan.
Construction of access road on nepal side (down stream) of the 110 meter double lane motor bridge under construction between india and nepal at charchhoom over kali river in dharchula assembly of pithoragarh district, under state plan.
Read moreRestoration of damaged road surface from caused due to underground water supply pipe laying under guwahati water supply project along roads d by l and t construction under jalukbari territorial road division under sopd g for the year 2025 26
Restoration of damaged road surface from caused due to underground water supply pipe laying under guwahati water supply project along roads d by l and t construction under jalukbari territorial road division under sopd g for the year 2025 26
Read moreof your Industry type