Tender Details
About Tender
🌉 Invitation For Bids: Remodeling Of Jacob Drain Vr Bridge 🛠️🏗️ The Department Of Water Resources, State Govt. And Ut, Invites Bids For The Remodeling Of The Old Rcc Pipe Vr Bridge Of Jacob Drain At Rd 5000 Near Village Daroli, Patiala. The Project Aims To Enhance The Bridge's Structural Integrity And Ensure Its Functionality Before The Upcoming Flood Season Of 2024 25, Thereby Safeguarding Nearby Habitats And Agricultural Lands From Potential Flooding. 📅 Bid Submission Deadline: April 25, 2024, 11:00 Am Tender Fee: Inr 6900 Emd: Inr 120000 Interested Contractors Must Possess The Requisite Expertise In Civil Construction And Bridge Remodeling, With A Proven Track Record Of Similar Projects. Bids Should Encompass Detailed Project Plans, Cost Estimates, And Timelines For Completion. Keywords: Bridge Remodeling, Jacob Drain, Rcc Pipes, Flood Prevention, Water Resources Department, Government Contract, Bid Submission, PatialaParticulars | Details |
---|---|
Title |
Contingency Work Of Replacement Of Rising Line From Ow To Dodwaniyo Ka Khera Village And Distribution Pipeline At Jjy Dodwaniyo Ka Khera, Of Village Dodwaniyo Ka Khera G.P. Bamniya Block Banera.
|
Description |
Contingency Work Of Replacement Of Rising Line From Ow To Dodwaniyo Ka Khera Village And Distribution Pipeline At Jjy Dodwaniyo Ka Khera, Of Village Dodwaniyo Ka Khera G.P. Bamniya Block Banera.
|
Organisation | PHED-Chief Engineer(HQ),Jaipur | State Govt. and UT |
Tender Id | 2024_WR_120674_1 |
Reference Number |
109/24-25 |
Tender Fee | 2000 |
EMD | 25376 |
Tender Value | |
Place | SHAHPURA |
Link | https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=815504 |
Start Date | March 24, 2025 15:30 |
End Date |
03/04/2025 ( Expired 18 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Manning for operation and maintenance of 185 mld narmada water supply project comprising intake well at hirani, water treatment plant at khatpura, bpt, ahmadpur pump house, mbsr and pipe line from hirani to mbsr.
Manning for operation and maintenance of 185 mld narmada water supply project comprising intake well at hirani, water treatment plant at khatpura, bpt, ahmadpur pump house, mbsr and pipe line from hirani to mbsr.
Read moreConstruction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreSupply, installation and commissioning of csrl pipeline from raw water treatment plant to effluent treatment plant-2 at nfc-kota, rawatbhata.
Supply, installation and commissioning of csrl pipeline from raw water treatment plant to effluent treatment plant-2 at nfc-kota, rawatbhata.
Read moreDay to day repairing and replacement work of doors, s, ventilators made of wood, steel, aluminium, pvc for different type of quarters, dormitories, office buildings, phps etc. at dvc, panchet
Day to day repairing and replacement work of doors, s, ventilators made of wood, steel, aluminium, pvc for different type of quarters, dormitories, office buildings, phps etc. at dvc, panchet
Read moreNiet no. - 52 of the fy 2024-2025 of the ee/bqa, phe dte.(sl.no-01)
Restoration of work (for temporary and final closer) of a ghogh over the left bank of the kotulpur branch canal below the phe pipe line in between ch. 600.00 to 615.00 in mouza-hariharchak, g.p- mirjapur,p.s and block- kotulpur, dist- bankura
Read moreConstruction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Read moreConst of drainage system from campus to existing canal of state govt bihar near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Const of drainage system from campus to existing canal of state govt bihar , near village and beautification of existing nalah at 48th bn katihar and construction of rain water harvesting system in the campus area of 48th bn, itbp, katihar bihar
Read moreUpgradation of rural road from nh-04 to nimbutala village, at rangat north and middle andaman under pmgsy-iii
Upgradation of rural road from nh-04 to nimbutala village, at rangat north and middle andaman under pmgsy-iii
Read moreConstruction of field channel/ drains at work site lone yen in village chowan for a length of 89 mts. from rd 129-189 and 204-233 -- project sangarwani -- estimated cost rs. 200000 --
Construction of field channel/ drains at work site lone yen in village chowan for a length of 89 mts. from rd 129-189 and 204-233 -- project sangarwani -- estimated cost rs. 200000 --
Read moreAAAAAAAAAA
Login to viewProtection work along&#x0d right bank of river padma&#x0d from house of islam uddin to bsf camera post (length 500m) at radhakrishnapur within g.p.- bilborakopara,&#x0d block and p.s.- lalgola,&#x0d dist. murshidabad
Read moreof your Industry type