Tender Details
Particulars | Details |
---|---|
Title |
Tolling Operation Maintenance And Transfer Of Four Lane Allahabad Bypass Section (From Km 628.753 To Km 713.215) Of Nh 2 (New Nh 19) In The State Of Uttar Pradesh (Tot Bundle 11) 2 Nd Call
|
Description |
Tolling Operation Maintenance And Transfer Of Four Lane Allahabad Bypass Section (From Km 628.753 To Km 713.215) Of Nh 2 (New Nh 19) In The State Of Uttar Pradesh (Tot Bundle 11) 2 Nd Call
|
Organisation | Central Public Procurement Portal 2 |
Tender Id | 2023_NHAI_167802_1 |
Reference Number |
NHAI/AssetMonetization/TOT/ 2022-23/TOTBundle-11/1 |
Tender Fee | 84462 |
EMD | 8.45 Crore |
Tender Value | 0 |
Place | NHAI HQ |
Link | https://etenders.gov.in |
Start Date | September 15, 2023 20:00 |
End Date |
16/10/2023 ( Expired 579 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Tolling operation maintenance and transfer of trichy thanjavur section of nh 83 and madurai tuticorin section of nh 38 in tamil nadu (tot bundle 19)
Read moreTolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Tolling operation maintenance and transfer of chandikhol bhadrak section of nh 16 panikholi rimuli section of nh 20 and rimuli koida section of nh 520 in the state of odisha (tot bundle 18)
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreConsultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreof your Industry type