Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Creation Of 4x63 Kva Sub Stations Including Laying Of Required 11 Kv Lines Under Samradhi Seema Yojna
|
| Description |
Creation Of 4x63 Kva Sub Stations Including Laying Of Required 11 Kv Lines Under Samradhi Seema Yojna
|
| Organisation | Government of Jammu and Kashmir |
| Tender Id | 2023_PDD_219165_1 |
|
Reference Number |
ED-III Jammu/33 of 2023-24 |
| Tender Fee | 1000 |
| EMD | 70000 |
| Tender Value | - |
| Place | Office of the Executive Engineer ED-III Jammu |
| Link |
View Original Tender Notice
https://jktenders.gov.in |
| Start Date | June 29, 2023 16:00 |
| End Date |
Expired
20/07/2023
Expired 1183 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Creation of 10x25, 4x63 kva s/stn. alongwith ht/lt line at dharmsal mendhar/guest house dana kalaban
Creation of 10x25, 4x63 kva s/stn. alongwith ht/lt line at dharmsal mendhar/guest house dana kalaban
Read moreCreation of 2, 250 kva, 11 /0.433 kv dedicated sub-station alongwith ht/lt network at agriculture office lalmandi srinagar
Creation of two 250 kva, 11 /0.433 kv dedicated sub-station alongwith ht/lt network at agriculture office lalmandi srinagar
Read moreRenovation - maintenance of various receiving stations of kpdcl sitc of 33kv isolators - 11kv isolators at various 33kv lines/ 33/11 kv receiving stations - 11kv outgoing feeders in respect of std ganderbal.pddss2627100223.
Renovation - maintenance of various receiving stations of kpdcl sitc of 33kv isolators - 11kv isolators at various 33kv lines/ 33/11 kv receiving stations - 11kv outgoing feeders in respect of std ganderbal.pddss2627100223.
Read moreSupply of material erection testing commissioning construction of 06 nos new 33 kv sub-stations assaudha chamaria road palri gohana shazadpur siwanamal with associated 33 kv 11 kv link lines including complete civil works on turnkey
Supply of material erection testing commissioning construction of 06 nos new 33 kv sub-stations assaudha chamaria road palri gohana shazadpur siwanamal with associated 33 kv 11 kv link lines including complete civil works on turnkey
Read moreSupply of material erection testing commissioning construction of 04 nos new 33 kv sub-stations dhanana cheeka ii kassan kanipla with associated 33 kv 11 kv link lines including complete civil works on turnkey basis under op circle
Supply of material erection testing commissioning construction of 04 nos new 33 kv sub-stations dhanana cheeka ii kassan kanipla with associated 33 kv 11 kv link lines including complete civil works on turnkey basis under op circle
Read moreSupply of material erection testing commissioning construction of 10 nos new 33 kv sub-stations kabri-iii samalkha chandoli saudapur indri city churni billona kurlan danoli haibatpur with associated 33 kv 11 kv link lines including civil work
Supply of material erection testing commissioning construction of 10 nos new 33 kv sub-stations kabri-iii samalkha chandoli saudapur indri city churni billona kurlan danoli haibatpur with associated 33 kv 11 kv link lines including civil work
Read moreCreation of infrastructure and installation of 11/0.43 kv, 3x1000 kva distribution transformer for system strengthening of three phase power supply system at the high court of tripura, agartala
Creation of infrastructure and installation of 11/0.43 kv, 3x1000 kva distribution transformer for system strengthening of three phase power supply system at the high court of tripura, agartala
Read moreRepair and replacement of spares to ht vcbs 11 kv sub stations rmus lbs 11 kv oh lines god lightening arrestors ht ug cables lt ug cables control cables lt panels apfc panels lt switch gears and its connected em works at eetf dsst dsp cic mrsam army
Repair and replacement of spares to ht vcbs 11 kv sub stations rmus lbs 11 kv oh lines god lightening arrestors ht ug cables lt ug cables control cables lt panels apfc panels lt switch gears and its connected em works at eetf dsst dsp cic mrsam army
Read moreTaking down of step up and down transformer 160kva after dismentling ht lt,gasket 6 mm thick superior quality on top cover plate,lt porcelain bushing with brass stud screwed with brass nuts bolts,ht 11 kv porcelain bushing with brass stud screwed with brass nuts,painting of transformer of rating 160 kva and voltage stabilizer with two coat,supply filling and top up with new transformer oil of electric strength,filtration dehydration of transformer oil of three phase servo voltage,rewinding of transformer 160 kva complete using appropriate size of copper,shifting of transformer from work shop to af stn including connecting,material and labour for arrange temporary power supply through comercial,trimming of tree branches to clear the ht lt oh lines girth span
Taking down of step up and down transformer 160kva after dismentling ht lt,gasket 6 mm thick superior quality on top cover plate,lt porcelain bushing with brass stud screwed with brass nuts bolts,ht 11 kv porcelain bushing with brass stud screwed with brass nuts,painting of transformer of rating 160 kva and voltage stabilizer with two coat,supply filling and top up with new transformer oil of electric strength,filtration dehydration of transformer oil of three phase servo voltage,rewinding of transformer 160 kva complete using appropriate size of copper,shifting of transformer from work shop to af stn including connecting,material and labour for arrange temporary power supply through comercial,trimming of tree branches to clear the ht lt oh lines girth span
Read moreCreation of 4x63 kva sub stations including laying of required 11 kv tap line under samridhi seema yojna
Creation of 4x63 kva sub stations including laying of required 11 kv tap line under samridhi seema yojna
Read moreof your Industry type