Tender Details

Particulars Details
Title
Supply And Replacement Of Aaac Covered Conductor In Place Of Olf Rabbit Conductor From 33 Kv Sub Station Munsyari To Chandani Under Edd Dharchula
Description
Supply And Replacement Of Aaac Covered Conductor In Place Of Olf Rabbit Conductor From 33 Kv Sub Station Munsyari To Chandani Under Edd Dharchula
Organisation MD - UPCL | State Govt. and UT
Tender Id 2025_UPCL3_82315_1
Reference
Number
02/EDC(P)/2025-26
Tender Fee 5900
EMD 1.79 Lakh
Tender Value
Place MUNSYARI
Link https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=98127
Start Date April 03, 2025 22:30
End Date

15/04/2025 ( Expired 54 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Tower package tw03 for zing-zingbar to sissu portion of 350 kv hvdc pang-kaithal transmission line

Tower package tw03 for i zingzingbar to sissu portion of 350 kv hvdc pangkaithal line associated with transmission system for evacuation of re power from renewable energy parks in leh 5 gw lehkaithal transmission corridor under rtm route

Read more
Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Widening and strengthening of daringbadi ghat portion from km 231.000 to 256.000 (design chainage from km 229.500 to 256.468) of nh-59 under nh(o) in hybrid annuity mode plan 2023-24 in the state of odisha (design length 26.968 kms).

Read more
Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502.

Supply and etc of 2 nos. 132 kv grid sub-stations at japanese zone (kotputli-behror) and chhawsri (jhunjhunu) along with associated lines (02 km d c, 15 km s c approx.) 02 no. 132kv bays at 220kv gss neemrana) under bn-9015002502

Read more
W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

W.s. of 2 lane to 4 lane with divided carriageway from ch 67.471 (mathurapur) to ch 69.256 (muktapurrob) and construction of h.l rcc bridge(8x24.00m) over river budhi gandak in place of old damaged screw pile bridge at near magardahi ghat of nh 322.

Read more
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Supply, commissioning/retrofitting of 400 kv isolator at powergrid maithon sub station in er-ii under addcap 2019-2024

Supply, commissioning/retrofitting of 400 kv isolator at powergrid maithon sub station in er-ii under addcap 2019-2024

Read more
Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.

Construction of balanced work of 2 lane h.l. rcc bridge with its approaches from ch 0.000 to 2.150 km across river sone in the state of bihar (via panduka) and jharkhand under crif scheme on epc mode.

Read more
6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call

6 laning of hapur bypass to moradabad section including hapur bypass from km 50 to km 148.277 of nh-9 and from km 148 to km 149.250 (including existing flyover) in the state of up on dbfot (toll) under nhdp phase-v 2nd call

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise