Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Toilet Block 9.76 Mtr X 5.50 Mtr With Additional 1.50 Mtr Verandah I/C C/O Plinth & Foundation,Recr
|
| Description |
|
| Organisation | Central Armed Police Forces | Ministry of Home Affairs |
| Tender Id | GEM/2025/B/6374851 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | June 23, 2025 23:15 |
| End Date |
Expired
14/07/2025
Expired 460 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Const. of additional 2nd 20 mva 66/11 kv t/f plinth, switch gear foundation and allied civil works at 132 kv s/s bhikhiwind.
Const. of additional 2nd 20 mva 66/11 kv t/f plinth, switch gear foundation and allied civil works at 132 kv s/s bhikhiwind.
Read moreConstruction of additional 3rd 10/12.5 mva 66/11 kv t/f plinth, switch gear foundation and allied civil works at 220 kv s/s khassa.
Construction of additional 3rd 10/12.5 mva 66/11 kv t/f plinth, switch gear foundation and allied civil works at 220 kv s/s khassa.
Read moreModular prefabricated shelter 7 pt 5 mtr x 20 mtr with verandah,modular prefabricated shelter 6 pt 10 mtr x 7 pt 2 mtr
Modular prefabricated shelter 7 pt 5 mtr x 20 mtr with verandah,modular prefabricated shelter 6 pt 10 mtr x 7 pt 2 mtr
Read moreUrgent requirment of foundation plinth for installing new 33/11 kv 20 mva power transformer in the jurisdiction of sd ii r div xi vasco
Urgent requirment of foundation plinth for installing new 33/11 kv 20 mva power transformer
Read moreSupply and installation of additional 5 star 1.50 ton ac split machine including point wiring distribution and shifting of dg set to new blood bank area at dhh buildings balangir
Supply and installation of additional 5 star 1.50 ton ac split machine including point wiring distribution and shifting of dg set to new blood bank area at dhh buildings balangir
Read moreConstruction of h.l. bridge over mermeda nallah on jally to bhuinpur road under setu bandhan yojana for the year 2026-27. open foundation (span-3x30.64 mtr.)
Construction of h.l. bridge over mermeda nallah on jally to bhuinpur road under setu bandhan yojana for the year 2026-27. open foundation (span-3x30.64 mtr.)
Read moreDesign and engineering, manufacture and supply, installation, erection and commissioning of multichannel multifuel burner and additional coalmill bag filter including civil foundation and supporting structures at mcl walayar on turnkey basis
Design and engineering, manufacture and supply, installation, erection and commissioning of multichannel multifuel burner and additional coalmill bag filter including civil foundation and supporting structures at mcl walayar on turnkey basis
Read moreConstruction of h.l. bridge over gurudiha nallah on udaygiri to kardangi road under setu bandhan yojana for the year 2025-26. well foundation (span-3x30.64 mtr.) in the district of kendujhar.
Construction of h.l. bridge over gurudiha nallah on udaygiri to kardangi road under setu bandhan yojana for the year 2025-26. well foundation (span-3x30.64 mtr.) in the district of kendujhar.
Read moreConstruction of h.l. bridge over local nallah at 2nd km. on tarava to ambo road under setu bandhan yojana for the year 2025-26 well foundation (span-3x30.64 mtr.) in the district of kendujhar.
Construction of h.l. bridge over local nallah at 2nd km. on tarava to ambo road under setu bandhan yojana for the year 2025-26 well foundation (span-3x30.64 mtr.) in the district of kendujhar.
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreof your Industry type