Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Kmda/Civil/Bppd Ii /Eand Am/11 Of 2024 25
|
Description |
Bank Protection Work Along With Construction Of R.C.C. Permanent Ghat And De Silting Work At Ganga Arati Pond Situated Near Patuli Fire Station At Patuli Township And Renovation Work At Chat Puja Ghat At Patuli Township, Ward No. 110, Kolkata.
|
Organisation | KOLKATA METROPOLITAN DEVELOPMENT AUTHORITY | State Govt. and UT |
Tender Id | 2025_KMDA_829260_1 |
Reference Number |
KMDA/CIVIL/BPPD-II /EandAM/11 of 2024-25 |
Tender Fee | 0 |
EMD | 75125 |
Tender Value | |
Place | Patuli Township, Ward No. 110, Kolkata. |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1846548 |
Start Date | March 20, 2025 23:00 |
End Date |
04/04/2025 ( Expired 75 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
AAAAAAAAAA
Login to viewProviding consultancy services for planning, preparation of detail project report (dpr), detailed design drawings and soq with specifications of electrical and mechanical services along with civil renovation works i/c providing technical support during/after the execution of work at punjab national bank, united tower, kolkata-700001.
Read moreSupply of material and skilled labour for remodeling and renovation of pond at village ubhawal pond no. 02 (near state bank of india) block and district sangrur. (nrega convergence work).
Supply of material and skilled labour for remodeling and renovation of pond at village ubhawal pond no. 02 (near state bank of india) block and district sangrur. (nrega convergence work).
Read moreWbiw/ctu/ce(n)/e-nit-04(e)/ 2025-26 sl01
Protection work along left bank of river ganga from manikchak ferry ghat towards upstream (ch.-29.500 km to ch.30.600 km upstream of farakka barrage) (length 1150 m) at narayanpur within block and p.s.-manikchak, dist.-malda
Read moreKmda/civil/ee/bppd-ii /eandam/01 of 2025-26
Bank protection work along with construction of r.c.c. permanent ghat and desilting work at ganga arati pond situated near patuli fire station at patulitownship and renovation work at chat puja ghat at patulitownship, ward no. 110, kolkata.(2nd call)
Read moreConstruction/renovation work of pond situated at collectorate campus (cleaning and digging, stone boulder pitching and fixing of m.s. grill/railing), tempo stand near patharkata chauraha and 04 nos traffic booth at district fatehpur.
Construction/renovation work of pond situated at collectorate campus (cleaning and digging, stone boulder pitching and fixing of m.s. grill/railing), tempo stand near patharkata chauraha and 04 nos traffic booth at district fatehpur.
Read moreKmda/civil/bppd-ii /eandam/11 of 2024-25
Bank protection work along with construction of r.c.c. permanent ghat and de-silting work at ganga arati pond situated near patuli fire station at patuli township and renovation work at chat puja ghat at patuli township, ward no. 110, kolkata.
Read moreBalli piling work at river flood zone, as per departmental specifications, for protection from flood and erosion near village kolhupurva, situated at right bank of river sharda, distt. sitapur.
Balli piling work at river flood zone, as per departmental specifications, for protection from flood and erosion near village kolhupurva, situated at right bank of river sharda, distt. sitapur.
Read moreWbpwd/sge/raj/niet-20/24-25_2
Renovation of golap bagan pathway (guard shade to rest shade) and protection work of pond s bank along pathway at barrackpore under sge/wb during the year 2024- 2025
Read moreWork of renovation of cisf mess, constructon of store shed in cisf fire station construction of bathroom in fire barrack atps and grouting of channel in in nala situated at chopan end side of wagon trippler btps obra
Work of renovation of cisf mess, constructon of store shed in cisf fire station construction of bathroom in fire barrack atps and grouting of channel in in nala situated at chopan end side of wagon trippler btps obra
Read moreMaking of earthing arrangement making of shed for protection of capacitor bank along with civil foundation work for installation and commissioning of capacitor bank and repair of existing shed at 11kv/3.3 kv sub-station yard under sdocm.
Making of earthing arrangement making of shed for protection of capacitor bank along with civil foundation work for installation and commissioning of capacitor bank and repair of existing shed at 11kv/3.3 kv sub-station yard under sdocm.
Read moreof your Industry type