Tender Details

Particulars Details
Title
Bottom Casting 985 Hcb9162
Description
Organisation Department of Defence Production | Ministry of Defence
Tender Id GEM/2023/B/4000241
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date September 23, 2023 15:04
End Date
Expired 03/10/2023

Expired 1107 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Ministry: Ministry Of Defence
Department: Department Of Defence Production
Organisation: Bharat Earth Movers Limited (beml)

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On MSE/MII Status Status
1 BHARGAV ALLOY CASTINGS PRIVATE LIMITED Make : OEM Model : BOTTOM - 985HCB9162 Title : BOTTOM - 985HCB9162 07-10-2023 10:22:15 MII MSE Qualified
2 S.R.S. ALLOYS PRIVATE LIMITED Make : SRS ALLOYS Model : SRS ALLOYS Title : BOTTOM 985HCB9162 08-10-2023 13:46:44 MII Qualified

Financial Evaluation Results

S.No. Seller Name Offered Item Total Price Rank
1 S.R.S. ALLOYS PRIVATE LIMITED(MII) Item Categories : BOTTOM CASTING-985HCB9162 174000.00 L1
2 BHARGAV ALLOY CASTINGS PRIVATE LIMITED (MSE,MII)( MSE Social Category:NA ) Item Categories : BOTTOM CASTING-985HCB9162 200187.00 L2
Similar Tenders
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system

Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system

Read more
Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system

Supply of clinker grinder bearings and h317 bearing sleeves for bottom ash handling system

Read more
Supply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system

Supply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system

Read more
Automation integration of 8 bay bottom loading gantry and tlf pumps and associated instruments at bakania depot

Automation integration of 8 bay bottom loading gantry and tlf pumps and associated instruments at bakania depot

Read more
Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Supply of seal plate for closing of openings/gaps on sides and bottom of 6a/b and 7 a/b conveyor gallery structure in chp area of btps, manuguru

Read more
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing

Read more
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg

Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg

Read more
Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027

Cc divn proximate analysis of coal samples on monthly basis and ultimate analysis of coal on quaterly basis and ash fly ash and bottom ash samples on half yearly basis in ktps vii stage from the period from commencement of work to till date 31 03 2027

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise