Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Name Of The Work : Ohe Modification For Construction Of Twins 2 Lane Rob And Its Approaches In Replacement Of Existing Gate No Ka 38 (Ry Km165/21 165/23) Between Chandrakona Road &Amp Garbeta Station In Kadamdih At Km159.448( Between Km158.3 And Km 161.2) Of Nh 60 In State Of West Bengal.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 79828963 |
|
Reference Number |
TRD-ADA-e-Tender-05-2025 |
| Tender Fee | 0 |
| EMD | 45500 |
| Tender Value | |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79828963/viewNitPdf_4849783.pdf |
| Start Date | February 07, 2025 00:23 |
| End Date |
Expired
28/02/2025
Expired 486 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Cs for supervision of dubrajpur bypass with 4-lane configuration of length 5.676 km on nh 60 (new nh-14) from design chainage 0.00 (existing km 316.135 on nh60) to design chainage 5.676 (existing km 320.980 on nh 60) in birbhum west bengal in epc mod
Read moreCs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode
Cs for supervision of 4 lane raniganj bypass of length 5.261 km on nh 60 (new nh 14) from km 275.20 of nh 60 to km 478.18 of nh 02 (new nh 19) in paschim bardhaman west bengal in epc mode
Read moreDevelopment of 4 lane ec from chandrakona ghatal road crossing to bowaichandi sec km41.000 to km89.814 of nh 116a (package2)in the state of west bengal under ham mode
Development of 4 lane ec from chandrakona ghatal road crossing to bowaichandi sec km41.000 to km89.814 of nh 116a (package2)in the state of west bengal under ham mode
Read moreConstruction of 2 lane rob and approaches in lieu of l.c no. 104e spl3 at km. 97 of 6 to7 between cherukuwada and undi railway stations on gudivada to bhimavaram section at nh km 170 of 400 on kathipudi to pamarru road of nh 214 new nh-165 in wes
Construction of 2 lane rob and approaches in lieu of l.c no. 104e spl3 at km. 97 of 6 to7 between cherukuwada and undi railway stations on gudivada to bhimavaram section at nh km 170 of 400 on kathipudi to pamarru road of nh 214 new nh-165 in wes
Read moreConstruction of 2 lane rob approaches balance works in lieu of l c no 104e spl3 at km 97 6 to 7 between cherukuwada undi railway stations on gudivada to bhimavaram section at nh km 170 400 on kathipudi to pamarru road of nh214 new nh 165
Construction of 2 lane rob approaches balance works in lieu of l c no 104e spl3 at km 97 6 to 7 between cherukuwada undi railway stations on gudivada to bhimavaram section at nh km 170 400 on kathipudi to pamarru road of nh214 new nh 165
Read moreDevelopment of 4 lane economic corridor from kharagpur to chandrakona ghatal road crossing section km 0.000 to km 41.000 of nh 116a (packagei) in west bengal under ham mode/ 2nd call
Development of 4 lane economic corridor from kharagpur to chandrakona ghatal road crossing section km 0.000 to km 41.000 of nh 116a (packagei) in west bengal under ham mode/ 2nd call
Read moreConstruction of rob and its approaches in lieu of level crossing no. 1_t_spl at barasat kazipara at km 3.250 on nh_35 on epc. job no. nh-35_wb_16_15_16_021_s and r_b_ and construction of rob and its approaches in lieu of existing level crossing lc no
Construction of rob and its approaches in lieu of level crossing no. 1_t_spl at barasat kazipara at km 3.250 on nh_35 on epc. job no. nh-35_wb_16_15_16_021_s and r_b_ and construction of rob and its approaches in lieu of existing level crossing lc no
Read moreDevelopment of 4 lane economic corridor from kharagpur to chandrakona ghatal road crossing sec km0.000 to km 41.000 of nh 116a (pkg i) in the state of west bengal under ham mode.
Development of 4 lane economic corridor from kharagpur to chandrakona ghatal road crossing sec km0.000 to km 41.000 of nh 116a (pkg i) in the state of west bengal under ham mode.
Read moreDevelopment of 4 lane economic corridor from chandrakona ghatal road crossing to bowaichandi section km 41.000 to km 89.814 of nh 116a (package-2) in the state of west bengal under ham mode
Development of 4 lane economic corridor from chandrakona ghatal road crossing to bowaichandi section km 41.000 to km 89.814 of nh 116a (package-2) in the state of west bengal under ham mode
Read moreRepair and rehabilitation of existing distressed bridges of nh 60
Repair and rehabilitation of existing distressed bridges of nh 60 new nh 14 under package 2 md bazar mini bridge at km 350.530 and kargil bridge at km 353.040 in the district of birbhum, west bengal in the year 2024 2025 in epc mode.
Read moreof your Industry type