Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Clo2 Room
|
| Description |
Construction Of Clo2 Room Incl Electrical Works
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_GAIL_177017_1 |
|
Reference Number |
GAIL/VC/C23223/NY/CIVIL |
| Tender Fee | 0 |
| EMD | 77300 |
| Tender Value | - |
| Place | VIJAIPUR |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | December 08, 2023 16:30 |
| End Date |
Expired
28/12/2023
Expired 1024 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Replacement of damaged clo2 supply ptfe lined ms flanged pipeline from clo2 plant to hwfl at pulp mechanical in tnpl unit i
Replacement of damaged clo2 supply ptfe lined ms flanged pipeline from clo2 plant to hwfl at pulp mechanical in tnpl unit i
Read moreProcurement of acid dosing pumps of clo2 plant at ntpc jhanor
Procurement of acid dosing pumps of clo2 plant at ntpc jhanor
Read moreElectrolyser feed header changing in clo2 plant at pulp mechanical in tnpl unit 1
Electrolyser feed header changing in clo2 plant at pulp mechanical in tnpl unit 1
Read moreRepairing and replacement of accessories in vam-413t at clo2 plant in pulp-mechanical at tnpl unit i
Repairing and replacement of accessories in vam-413t at clo2 plant in pulp-mechanical at tnpl unit i
Read moreAgency for the execution of mechanical works in the process scheme provision of new clo2 generation system in cooling towers ct 1 2 4 at pdr
Agency for the execution of mechanical works in the process scheme provision of new clo2 generation system in cooling towers ct 1 2 4 at pdr
Read moreDismantling, fabrication and erection of corroded structurals, equipment and repairing of overhead pipe line in clo2 plant, vam plant, so2 plant, cl2 plant and oxygen plant#1and 2 at pulp mill mech
Dismantling, fabrication and erection of corroded structurals, equipment and repairing of overhead pipe line in clo2 plant, vam plant, so2 plant, cl2 plant and oxygen plant#1and 2 at pulp mill mech
Read morePainting of corroded structurals and pipeline line in clo2 plant, wetlap#2 and 3, o2 plant#1 and 2, chlorine plant and vam plant at pulp mill mechanical in tnpl unit-1
Painting of corroded structurals and pipeline line in clo2 plant, wetlap#2 and 3, o2 plant#1 and 2, chlorine plant and vam plant at pulp mill mechanical in tnpl unit-1
Read moreLevel transmitter radar type,complete of level gauge with valves and connecting arrangement,air detector sensor with electrolyte,residual clo2 analyzer with flow through assembly and stand alone skid,hand held unit for measurement of residual clo2 calorimetric dpd,diaphragm pressure gauges compatible with ms purita make ptp skid,diaphragm pressure gauges compatible with ms purita make 30 percent idct skid,diaphragm pressure gauges compatible with ms purita make 70 percent idct skid,diaphragm pressure gauges compatible with ms purita make ndct skid,spare dosing pump part no10 for ms purita make ptp skid installed in clo2 plant at rapp 7 8,spare dosing pump part no10 for ms purita make 30 percent idct skid installed in clo2 plant at rapp78,ph analyzer sensor and transmitter,level switch compatible with ms purita make skids ptp skid 30 percent idct skid 70percent idct skid ndct skid,flot type level switch,pipe mounted sight glass compatible with ms purita make ptp skid,pipe mounted sight glass compatible wit
Level transmitter radar type,complete of level gauge with valves and connecting arrangement,air detector sensor with electrolyte,residual clo2 analyzer with flow through assembly and stand alone skid,hand held unit for measurement of residual clo2 calorimetric dpd,diaphragm pressure gauges compatible with ms purita make ptp skid,diaphragm pressure gauges compatible with ms purita make 30 percent idct skid,diaphragm pressure gauges compatible with ms purita make 70 percent idct skid,diaphragm pressure gauges compatible with ms purita make ndct skid,spare dosing pump part no10 for ms purita make ptp skid installed in clo2 plant at rapp 7 8,spare dosing pump part no10 for ms purita make 30 percent idct skid installed in clo2 plant at rapp78,ph analyzer sensor and transmitter,level switch compatible with ms purita make skids ptp skid 30 percent idct skid 70percent idct skid ndct skid,flot type level switch,pipe mounted sight glass compatible with ms purita make ptp skid,pipe mounted sight glass compatible wit
Read moreService contract for hiring of clo2 generator, raw water clo2 dosing and
Service contract for hiring of clo2 generator, raw water clo2 dosing andcooling water chemical treatment and monitoring for ntpc barauni.
Read moreDismantling, fabrication and erection of clo2 header in clo2 plant at pulp mechanical
Dismantling, fabrication and erection of clo2 header in clo2 plant at pulp mechanical
Read moreof your Industry type