Tender Details

Particulars Details
Title
Electrical Utility Shifting Including Shifting Of Electricity Pole And Line For Construction Of 2 Lane Rob In Lieu Of Level Crossing 76 Special (I.E.R.T. Gate), On Prayag Lucknow Railway Section And Between Phaphamau And Prayag Station And Between La
Description
Electrical Utility Shifting Including Shifting Of Electricity Pole And Line For Construction Of 2 Lane Rob In Lieu Of Level Crossing 76 Special (I.E.R.T. Gate), On Prayag Lucknow Railway Section And Between Phaphamau And Prayag Station And Between La
Organisation Government of Uttar Pradesh
Tender Id 2023_UPSBC_822130_1
Reference
Number
1155 /E-TENDER/2023-24 Dt. 17.07.2023
Tender Fee 11800
EMD 12.2 Lakh
Tender Value
Place Office of Chief Project Manager, Prayagraj Zon
Link https://etender.up.nic.in
Start Date July 18, 2023 21:00
End Date

28/07/2023 ( Expired 660 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode

Construction of 02 lane rail over bridge at level crossing no 300-spl chowka ghat budhwal block section km713 16 18 on gonda lucknow n.e. railway rail section in distt barabanki on epc mode

Read more
Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh

Construction of 2-lane rob at lc no.ab-27 (belbahara rob) on manendragarh to ambikapur section of nh-43 (old nh-78) at nh km 264.000 and railway chainage 937.14-15 between udalkachar-boridand stations in the state of chhattisgarh

Read more
Construction of 02-lane road over bridge in lieu of level crossing no. 556a at km. 1457/14-16 in the agra-palwal section of agra division of north central railway

Construction of 02-lane road over bridge in lieu of level crossing no. 556a at km. 1457/14-16 in the agra-palwal section of agra division of north central railway

Read more
Erection of 11 kv line 4.60 km under ground and 11 kv sub station 1 nos with erection of new pcc poles and dismantile of 11 kv line 1.10 km under ground and 11 kv sub station 1 nos for electrical utility shifting alond saran nagar nallah aen csd a vi

Erection of 11 kv line 4.60 km under ground and 11 kv sub station 1 nos with erection of new pcc poles and dismantile of 11 kv line 1.10 km under ground and 11 kv sub station 1 nos for electrical utility shifting alond saran nagar nallah aen csd a vi

Read more
Providing and laying ctsb, eta, tack coat, b.c. etc. work in viaduct portion and r.e.wall portion of 2 lane r.o.b. in lieu x-ing no-7c at km 846/23-25 on near saiyed sarawan railway station of north central railway on pry-cnb section in district kaus

Providing and laying ctsb, eta, tack coat, b.c. etc. work in viaduct portion and r.e.wall portion of 2 lane r.o.b. in lieu x-ing no-7c at km 846/23-25 on near saiyed sarawan railway station of north central railway on pry-cnb section in district kaus

Read more
Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).

Const. of 2 lane rob with the bow string steel beam in lieu of lc no. 118-c/e-2 at km. 250/9-11 in between dukheri- kesri railway station on sre-umb section on dfcc route in ambala distt. (rd. km. 0.00 to 0.585). (pdg. solar street light).

Read more
Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway

Construction of 2 lane rob with approaches in lieu of lc no. 22 at km 17/1-2 between barhan-etah section on prayagraj division of north central railway

Read more
Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross

Construction of rcc stair case of two nos. rob 2 lane rob in lieu of railway crossing no. 75-a of northern railway on prayag-lucknow rail section at railway km. 149 /10-11 in between prayag-phaphamau railway station and rob in lieu of railway cross

Read more
Construction of 2 lane rob. in lieu of at lxing 4c at km. 05h-06h on tapri hindon cabin section near tapri junction railway station in distt. saharanpur

Construction of 2 lane rob. in lieu of at lxing 4c at km. 05h-06h on tapri hindon cabin section near tapri junction railway station in distt. saharanpur

Read more
Shifting of electrical utility (11 kv ht pole and line ) for construction of berhampur ring road from 0/000 km to 12/300 km

Shifting of electrical utility (11 kv ht pole and line ) for construction of berhampur ring road from 0/000 km to 12/300 km under state plan for year 2023-24.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise