Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Environmental Protection Work For Extended Ob Dump Of Block B Mines Of Gandhamardan In The District Of Keonjhar.
|
| Description |
Environmental Protection Work For Extended Ob Dump Of Block B Mines Of Gandhamardan In The District Of Keonjhar.
|
| Organisation | Government of Odisha |
| Tender Id | 2023_OMC_96331_3 |
|
Reference Number |
NIT No.49/OMC/CIVIL/2023 |
| Tender Fee | 11800 |
| EMD | 65600 |
| Tender Value | - |
| Place | OMC Ltd., Bhubaneswar |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | November 04, 2023 00:25 |
| End Date |
Expired
17/11/2023
Expired 1064 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Protection cover for dump valve of lhb coaches
Protection cover for dump valve of lhb coaches
Read moreCustom bid for services - extension of 3300v ht oh line towards active ob dump area for lighting purpose at kolgaon ocm
Custom bid for services - extension of 3300v ht oh line towards active ob dump area for lighting purpose at kolgaon ocm
Read moreConstruction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Construction of garland drain with siltation pond , catch drain and retaining wall from ob dump tetulmari to punjabi more along nagri jore under tetulmari colliery under sijua area
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreTender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Tender for balance works of design, engineering, supply, construction, erection, testing and commissioning of 22 mw (ac) ob dump based solar pv power plant along with 10 years plant o and m at sccl
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreRep/maint flushing of submersible pump sets, electric control panels, dg protection system at rushikuliya pump house and flame proof wiring , water and flame proof light fittings and fixtures at amn dump, supply depot mag guards under ge (i) gos
Rep/maint flushing of submersible pump sets, electric control panels, dg protection system at rushikuliya pump house and flame proof wiring, water and flame proof light fittings and fixtures at amn dump, supply depot mag guards under ge (i) gos
Read moreInteractive panel 98 inch,intel pc high end i9 with s 11 pro,ups 20 kva with 30 backup,firewall 500 user,l3 switch manageable 24 port,kvm switch 16 port,biometric access control,power cable 3 core 10 min,environmental control device,changeover 63 amp,stabilizer 30 kva,surge protection equipment,surveillance camera,capping casing
Interactive panel 98 inch,intel pc high end i9 with s 11 pro,ups 20 kva with 30 backup,firewall 500 user,l3 switch manageable 24 port,kvm switch 16 port,biometric access control,power cable 3 core 10 min,environmental control device,changeover 63 amp,stabilizer 30 kva,surge protection equipment,surveillance camera,capping casing
Read moreExecutive safety helmet ratchet type. with following specifications. material: made up of polypropylene copolymer extended nape for extra impact protection to the users neck increased vertical clearance for optimum shock absorption ventilated holes which can be opened/ closed with the help of a shutter to prevent any rain water seepage, standard : is 2925:1984, color: super white, model : pn 542 of karam make or equivalent of venus/ 3m/ udyogi , make: karam / venus/ 3m/ udyogi, en 397:2012
Executive safety helmet ratchet type. with following specifications. material: made up of polypropylene copolymer extended nape for extra impact protection to the users neck increased vertical clearance for optimum shock absorption ventilated holes which can be opened/ closed with the help of a shutter to prevent any rain water seepage, standard : is 2925:1984, color: super white, model : pn 542 of karam make or equivalent of venus/ 3m/ udyogi , make: karam / venus/ 3m/ udyogi, en 397:2012
Read moreEnvironmental protection work for extended ob dump of block-b mines of gandhamardan in the district of keonjhar.
Environmental protection work for extended ob dump of block-b mines of gandhamardan in the district of keonjhar.
Read moreof your Industry type