Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Tm Unit Ii Renewal Of Gasket At Water Box Side Tube Nest Side Condensate Inlet And Outlet Flange Inspection And Cleaning Of Tube Nest And Hydraulic Testing Of Lph 3 And 4 Gc I And Allied Works
|
| Description |
Mtps I Tm Unit Ii Renewal Of Gasket At Water Box Side Tube Nest Side Condensate Inlet And Outlet Flange Inspection And Cleaning Of Tube Nest And Hydraulic Testing Of Lph 3 And 4 Gc I And Allied Works
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_368814_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / TM / OT. 302 /2023-24 |
| Tender Fee | 0 |
| EMD | 6700 |
| Tender Value | - |
| Place | Office of the Superintending Engineer /M-I/MTPS-I |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | September 12, 2023 14:30 |
| End Date |
Expired
18/09/2023
Expired 1123 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 2 3 4 gc 1 ejector 2a vent condenser and renewal of gasket at deaerator main
Mtps i tm unit ii renewal of gasket at water box side tube nest side condensate inlet and outlet flange inspection and cleaning of tube nest and hydraulic testing of lph 2 3 4 gc 1 ejector 2a vent condenser and renewal of gasket at deaerator main
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipe bends and patch welding the eroded portions of coal bends pipelines between mill outlet elbow and fuel inlet elbow during annual overhaul 2026 27
Read moreMtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27
Read moreMtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical
Mtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical
Read moreMtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Mtps tm unit ii removal of insulation and providing re insulation to pipe lines valves deaerator main flange vent condenser gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials for unit ii
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreTtps mechii tm i unitiii removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of
Ttps mechii tm i unitiii removal of deteriorated cladding over the inner surface of condenser east west cooling water inlet spool piece and outlet bends and rebuild the cladding with special epoxy putties to the required level including cost of
Read moreCutting,face machining,shot blasting and painting of inlet end and outlet end tube plate as per drg no- 11650540264 rev 23 item-01 and 02 to be follow tech annex-01 and qap.
Cutting,face machining,shot blasting and painting of inlet end and outlet end tube plate as per drg no- 11650540264 rev 23 item-01 and 02 to be follow tech annex-01 and qap.
Read moreAir receiver tank, as per is: 7938 - 1976/latest. technical specifications: capacity: 1000 liters , material of construction: conforming to is2062/ ss-304/is-2002, code of manufacture: is-2825/ asme sec viii div, shape type : vertical, 1/2 inch bsp outlet for pressure gauge, working pressure:10 kg/cm2 , maximum test pressure: 16 kg/cm2 , inlet & outlet connection: 2 inch or 1 1/2 inch flange connection, vessel bottom height from ground: min 300 mm, outlet connection 1 inch or 1 1/2 inch for p
Air receiver tank, as per is: 7938 - 1976/latest. technical specifications: capacity: 1000 liters , material of construction: conforming to is2062/ ss-304/is-2002, code of manufacture: is-2825/ asme sec viii div, shape type : vertical, 1/2 inch bsp outlet for pressure gauge, working pressure:10 kg/cm2 , maximum test pressure: 16 kg/cm2 , inlet & outlet connection: 2 inch or 1 1/2 inch flange connection, vessel bottom height from ground: min 300 mm, outlet connection 1 inch or 1 1/2 inch for p
Read moreAir receiver tank, as per is: 7938 -1976 /latest. technical specifications: capacity: 500 liters , material of construction: conforming to is2062/ ss-304/is-2002, code of manufacture: is-2825/ asme sec viii div, shape type : vertical,1/2 inch bsp outlet for pressure gauge, working pressure:10 kg/cm2 , maximum test pressure: 16 kg/cm2 , inlet & outlet connection: 2 inch or 1 1/2 inch flange connection, vessel bottom height from ground: min 300 mm, out let connection 1 inch or 1 1/2 inch for p
Air receiver tank, as per is: 7938 -1976 /latest. technical specifications: capacity: 500 liters , material of construction: conforming to is2062/ ss-304/is-2002, code of manufacture: is-2825/ asme sec viii div, shape type : vertical,1/2 inch bsp outlet for pressure gauge, working pressure:10 kg/cm2 , maximum test pressure: 16 kg/cm2 , inlet & outlet connection: 2 inch or 1 1/2 inch flange connection, vessel bottom height from ground: min 300 mm, out let connection 1 inch or 1 1/2 inch for p
Read moreof your Industry type