Tender Details

Particulars Details
Title
Mtps I Tm Unit Ii Renewal Of Gasket At Water Box Side Tube Nest Side Condensate Inlet And Outlet Flange Inspection And Cleaning Of Tube Nest And Hydraulic Testing Of Lph 1 2 3 4 Gc I Ii Vent Condenser Renewal Of Gasket At Deaerator Main Flange
Description
Mtps I Tm Unit Ii Renewal Of Gasket At Water Box Side Tube Nest Side Condensate Inlet And Outlet Flange Inspection And Cleaning Of Tube Nest And Hydraulic Testing Of Lph 1 2 3 4 Gc I Ii Vent Condenser Renewal Of Gasket At Deaerator Main Flange
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_489922_1
Reference
Number
CE / MTPS-I / SE / M-I / TM /OT. 192 / 2024-25
Tender Fee 0
EMD 9000
Tender Value
Place Mettur Thermal Power Station-I / Mettur Dam
Link https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=582107
Start Date September 30, 2024 23:30
End Date

14/10/2024 ( Expired 211 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Mtps i tm unit i cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets

Mtps i tm unit i cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets

Read more
Mtps i tm unit i overhauling of olctc system pump lhs rhs inspection cleaning of condenser cw box steam side hot well olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve and condenser

Mtps i tm unit i overhauling of olctc system pump lhs rhs inspection cleaning of condenser cw box steam side hot well olctc system ball collecting screen overhauling of 200 mm condenser air release cum vacuum breaking valve and condenser

Read more
Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau

Mtps tm unit i removal of insulation and providing re insulation to pipe lines valves deaerator main flange gland steam cooler low pressure heater flash tanks and its accessories and disposal of waste insulation materials during unit i annual overhau

Read more
Mtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26

Mtps i tm unit i overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit i during aoh 2025 26

Read more
Mtps i bm unit i aoh 2025 26 cutting and patch welding on the eroded portion of the fg duct from eco outlet to aph inlet renewal of support beam both inlet and allied works

Mtps i bm unit i aoh 2025 26 cutting and patch welding on the eroded portion of the fg duct from eco outlet to aph inlet renewal of support beam both inlet and allied works

Read more
Ttps mech ii tm i units i ii iii conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning 01 04 25 to 31

Ttps mech ii tm i units i ii iii conducting tube cleaning in the surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning 01 04 25 to 31

Read more
Ttps mech ii tm i unit i ii iii inspection and cleaning of suction strainer caisson inspection rectification of thrust bearing breakdown works of mc pumps drip pumps and air compressors for the period from 01 04 25 to 31 03 26

Ttps mech ii tm i unit i ii iii inspection and cleaning of suction strainer caisson inspection rectification of thrust bearing breakdown works of mc pumps drip pumps and air compressors for the period from 01 04 25 to 31 03 26

Read more
Mtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit

Mtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise