Tender Details

Particulars Details
Title
2nd Attempt Maintenance Work At Risk And Cost Of Epc Contractor As Per Agreement Clause No. 10.4.2 Widening Of Existing 2 Lane To 4 Lane Including Geometric Improvement And Reconstruction Of Existing Structure Between Km. 56.620 To Km. 61.520 On Nh 58
Description
2nd Attempt Widening Of Existing 2 Lane To 4 Lane Including Geometric Improvement And Reconstruction Of Existing Structure Between Km. 56.620 To Km. 61.520 On Nh 58 In The State Of Gujarat Under Epc Made. Paver Patta Of Bc On Ch. 56.620 To 61.520
Organisation Central Public Procurement Portal 1
Tender Id 2023_MoRTH_768906_2
Reference
Number
11 of 2023-24
Tender Fee 1500
EMD 41600
Tender Value -
Place Gandhinagar
Link
View Original Tender Notice

https://eprocure.gov.in

Start Date September 16, 2023 23:30
End Date
Expired 03/10/2023

Expired 1106 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Overlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor

Overlay at various stretches of 6-lane access-controlled greenfield highway from km 67.000 to km 99.000 of rajasthan gujarat border to santalpur section of nh-754a in gujarat on epc mode at risk and cost of existing contractor

Read more
8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor

8 lane dwarka expressway from shiv murti to rub delhi (chainage from km 0.600 to km 5.300) in the state of delhi (package i / nh 248bb) 2nd call works to be carried out at risk and cost of epc contractor

Read more
Execution of pothole rectification/filling works of nh 53 at the risk n cost of the epc contractor of duburi chandikhole of nh 53 in the state of odisha

Execution of pothole rectification/filling works of nh 53 at the risk n cost of the epc contractor of duburi chandikhole of nh 53 in the state of odisha

Read more
Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha

Rectification of roughness/unevenness identified in pqc pavement at the risk n cost of epc contractor of 4 laning of angul sambalpur section of nh 55 in the state of odisha

Read more
Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh

Balance work for const of western side spur of rampur rudrapur sec connecting nh24 to nh 87 bypassing rampur town at risk and cost of contractor on epc mode in uttar pradesh.

Read more
Rectification of defects on four lane mahuva to kagvadar section of nh-8e from km 100.100 to km 139.915 (design chainage from km 100.450 to km 140.470) pkg-iii in the state of gujarat at risk and cost of existing contractor

Rectification of defects on four lane mahuva to kagvadar section of nh-8e from km 100.100 to km 139.915 (design chainage from km 100.450 to km 140.470) pkg-iii in the state of gujarat at risk and cost of existing contractor

Read more
Capacity augmentation by construction of pqc service roads and misc works at various locations of 6 lane motachiloda km 494.410 to nanachiloda km 509.550 of nh-48 in gujarat on single percentage item rate basis at risk and cost of existing contractor

Capacity augmentation by construction of pqc service roads and misc works at various locations of 6 lane motachiloda km 494.410 to nanachiloda km 509.550 of nh-48 in gujarat on single percentage item rate basis at risk and cost of existing contractor

Read more
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)

Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)

Read more
Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.

Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.

Read more
Routine maintenance work of flyover at y junction in rahatgaon in front of hotel gauri inn amravati from km.148.490 to km 150.070 on nh6 on risk and cost of epc contractor on item rate basis (2nd call)

Routine maintenance work of flyover at y junction in rahatgaon in front of hotel gauri inn amravati from km.148.490 to km 150.070 on nh6 on risk and cost of epc contractor on item rate basis (2nd call)

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise