Tender Details
About Tender
🏗️ Invitation For Bids: Construction Of 132k V Outdoor Gis Feeder Bay 🏭🔌 U.P. Power Transmission Corporation Ltd., A State Government Undertaking, Invites Bids From Reputable Contractors For The Construction Of Two (2) Nos. 132k V Outdoor Gas Insulated Switchgear (Gis) Feeder Bays At Lucknow. 📅 Bid Submission Deadline: July 4, 2024, 12:00 Pm 💸 Tender Fee: Inr 2950 Earnest Money Deposit (Emd): Inr 10,53,000 Interested Bidders Must Possess The Requisite Expertise And Experience In High Voltage Electrical Infrastructure Projects. Detailed Bids Should Encompass Technical Specifications, Cost Estimates, And Project Timelines, In Accordance With The Project Description And Relevant Construction Standards. Keywords: Construction, 132k V Outdoor Gis Feeder Bay, U.P. Power Transmission Corporation Ltd., State Govt. And Ut, Tender, Bid, Electrical Infrastructure, Gas Insulated Switchgear (Gis)Particulars | Details |
---|---|
Title |
Construction Of 2 Nos. 132k V Outdoor Gis Feeder Bay
|
Description |
Construction Of 132k V Outdoor Gis Feeder Bay
|
Organisation | U.P. Power Transmission Corporation Ltd. | State Govt. and UT |
Tender Id | 2024_PTRCL_926177_1 |
Reference Number |
esd-8/209 |
Tender Fee | 2950 |
EMD | 10.53 Lakh |
Tender Value | |
Place | lucknow |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1599716 |
Start Date | June 05, 2024 23:00 |
End Date |
04/07/2024 ( Expired 340 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDetailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Detailed design construction, testing and commissioning of national maritime heritage complex at lothal gujarat phase-1b through engineering procurement and construction epc mode
Read moreDesign, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Design, supply, install, test and commission innovative and immersive 3d projection mapping at thirumalai nayakkar mahal, madurai (package-2) with operations and maintenance for a period of 10 years on ppp basis
Read moreConstruction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.
Read moreCs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.
Read moreConsultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km
Consultancy services for authoritys engineer for supervision of construction of road from huri taliha section of frontier highway nh 913 huri parsi palo km 0.00 to 55.725 55.725 km
Read moreConsultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 bameng khenewa 43 65 to 85 60 41 950 km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh-913 bameng khenewa 43 65 to 85 60 41 950 km
Read moreConsultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km
Consultancy services for authoritys engineer for supervision of construction of road from lada sarli section of frontier highway nh 913 koloriang to sarli km 168.0 to 183.40 15.40 km and sarli to huri km 0.00 to 78.38 78.38km
Read moreof your Industry type