Tender Details
Particulars | Details |
---|---|
Title |
Patch Repair And Pot Holes Filling Work At Various Roads At Block Dahgavan Under Constituency Sahaswan In Year 2024 25
|
Description |
Patch Repair And Pot Holes Filling Work At Various Roads At Block Dahgavan Under Constituency Sahaswan In Year 2024 25
|
Organisation | Cheif Engineer Bareilly Zone PWD Bareilly | State Govt. and UT |
Tender Id | 2024_CEBLY_981055_1 |
Reference Number |
2379(2)/NIVIDA(ET)/2024 Dtd 27-11-2024 |
Tender Fee | 944 |
EMD | 1.8 Lakh |
Tender Value | |
Place | BUDAUN |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1759227 |
Start Date | January 16, 2025 17:30 |
End Date |
28/01/2025 ( Expired 132 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i
Re-bidding strengthning and improvement of roads under world bank aided project tresp in rupaichari block under sabroom division, pwd (r and b). gr-i
Read moreRepair to bituminous roads and road furniture in technical and domestic area at dappar under age i dappar
Repair to bituminous roads and road furniture in technical and domestic area at dappar under age i dappar
Read moreSupply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Supply, delivery, fandi, dismantling, installation and commissioning of control and relay panel and its associated cables as per ts for upgradation of powergrid feeders that has served more than 25 years feeders at other sebs - nerts under add cap 2024-29 block
Read moreDalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreNagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Nagor re- alignment stretch from km. 415.900 to km. 418.300 surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreAAAAAAAAAA
Login to viewAnnual o and m of kalgram and kharsa (direct pump) piped water supply scheme in khargram block under murshidabad division phe dte.
Read moreSpl repair to bldg no. p-283 and p-284 at otm - i (against job no 81 sa/btd/sr(bldg)-01/2024-25) under ge south bathinda at bathinda mil stn.
Spl repair to bldg no. p-283 and p-284 at otm - i (against job no 81 sa/btd/sr(bldg)-01/2024-25) under ge south bathinda at bathinda mil stn.
Read moreConstruction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Construction of bridge at luna rd 150 450 on nh 154a in the state of himachal pradesh sh 41 5 m span steel composite bridge, bailey bridge dismantling of bailey bridge formation cutting and filling protection work metalling and tarring
Read more10 dyce ds circle ropar 2025 26
Providing gang for the work of attending to resolving the fuse off call complaints and lt ht line breakdowns for restoration of electrical power supply in the various sub divisions under ds division under ds circle pspcl ropar on per day basis
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreof your Industry type