Tender Details
Particulars | Details |
---|---|
Title |
Testing Of 33/11 Kv Breakers And Power Transformers Installed At 33/11 Kv S/S In The Arear Of Vrindavan Under Jurisdiction Of Ee Eutd Vrindavan Lucknow, Against O And M 2024 25 Scheme
|
Description |
Testing Of 33/11 Kv Breakers And Power Transformers Installed At 33/11 Kv S/S In The Arear Of Vrindavan Under Jurisdiction Of Ee Eutd Vrindavan Lucknow, Against O And M 2024 25 Scheme
|
Organisation | Madhyanchal Vidyut Vitran Nigam Ltd | State Govt. and UT |
Tender Id | 2025_MVVNL_989281_1 |
Reference Number |
34/EUDC-VRINDAVAN/LESA/2024-25 |
Tender Fee | 1180 |
EMD | 7300 |
Tender Value | |
Place | VRINDAVAN |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1849502 |
Start Date | April 02, 2025 00:25 |
End Date |
07/04/2025 ( Expired 13 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of flood protection wall, rain water harvesting, ramps at 66 kv s/s bajeke under o and m division fazilka
Construction of flood protection wall, rain water harvesting, ramps at 66 kv s/s bajeke under o and m division fazilka
Read moreSurvey design and execution of sewerage scheme samba town under pollution abatement of river basanter at samba jkunder nrcp on epc fixed cost basis incl o and m for 5 years after successful completion of free trial of 6 mths. cno sdj/w/76/24-25
Survey design and execution of sewerage scheme samba town under pollution abatement of river basanter at samba jkunder nrcp on epc fixed cost basis incl o and m for 5 years after successful completion of free trial of 6 mths. cno sdj/w/76/24-25
Read moreEstimate tor shitting of 11 kv line lt line 100 and 200 kva x mer s s and 11 kv road crossing due to road widening in daboh town under daboh d e o and m du. lahar under municipal council daboh distt. bhind second call
Estimate tor shitting of 11 kv line lt line 100 and 200 kva x mer s s and 11 kv road crossing due to road widening in daboh town under daboh d e o and m du. lahar under municipal council daboh distt. bhind second call
Read moreAAAAAAAAAA
Login to viewSupplying and dosing of bleaching powder of bcpl dcm make at 7 nos d.t.w located at....danshpara within salap gp-i under bankra faws scheme for 365 days.
Read moreTender for the work of enhancement of existing 200 kva dtc to 400 kva for arranging power supply to 1 no ltd connection to m s r bandekar and co pvt ltd wadachawada shirgao for a load of 18 02 kw in the jurisdiction of s o assonora under sdi bich
Tender for the work of enhancement of existing 200 kva dtc to 400 kva for arranging power supply to 1 no ltd connection to m s r bandekar and co pvt ltd wadachawada shirgao for a load of 18 02 kw in the jurisdiction of s o assonora under sdi bich
Read moreDesign, engineering, manufacture, supply, erection, testing and commissioning of 50 mva, 132/33 kv three phase power transformer with allied works for the project replacement of aged and old 16.66 mva,132/33kv single phase power transformers at gss
Design, engineering, manufacture, supply, erection, testing and commissioning of 50 mva, 132/33 kv three phase power transformer with allied works for the project replacement of aged and old 16.66 mva,132/33kv single phase power transformers at gss p
Read moreSupply of 132 kv bus isolator spare parts and related installation work for 132 kv m/s hyosung make gis installed at 400 kv gis s/s sector-123, noida under etd-ii, noida under transmission west zone, meerut
Supply of 132 kv bus isolator spare parts and related installation work for 132 kv m/s hyosung make gis installed at 400 kv gis s/s sector-123, noida under etd-ii, noida under transmission west zone, meerut
Read moreThe supply of 11 kv ctpt combined metering unit o/d unit of various ratio under the jurisdiction of ee, eutd-vrindavan, amausi zone, lucknow against o and m head year 2025-26
The supply of 11 kv ctpt combined metering unit o/d unit of various ratio under the jurisdiction of ee, eutd-vrindavan, amausi zone, lucknow against o and m head year 2025-26
Read moreM/o completed scheme under nazul a/c/ii/hz. (providing and fixing two ppgi puf porta cabin (police booth) two bamboo security huts at mehrauli archaeological park under the territorial jurisdiction of horticulture division/iv/hz/dda.
M/o completed scheme under nazul a/c/ii/hz. (providing and fixing two ppgi puf porta cabin (police booth) two bamboo security huts at mehrauli archaeological park under the territorial jurisdiction of horticulture division/iv/hz/dda.
Read moreThe work for attending oil leakage from various points of 2 nos. 10 mva power t/f installed at 33/11 kv s/s townhall, varanasi under ee, uedd-iii, varanasi in o and m scheme 2025-26
The work for attending oil leakage from various points of 2 nos. 10 mva power t/f installed at 33/11 kv s/s townhall, varanasi under ee, uedd-iii, varanasi in o and m scheme 2025-26
Read moreof your Industry type