Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Wbsdb/Ee/Ced I/Nit 07(e)/2023 24/4
|
| Description |
Construction Of Concrete Road Plan
|
| Organisation | Government of West Bengal |
| Tender Id | 2023_SAD_561413_4 |
|
Reference Number |
WBSDB/EE/CED-I/NIT 07(e)/2023-24 |
| Tender Fee | - |
| EMD | 2.82 Lakh |
| Tender Value | - |
| Place | OFFICE OF THE EXECUTIVE ENGINEER, CED-I, SDB |
| Link |
View Original Tender Notice
https://wbtenders.gov.in |
| Start Date | August 31, 2023 19:30 |
| End Date |
Expired
21/09/2023
Expired 1121 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Topographical and hydrographical survey, sub-soil investigation for construction of precast rcc passenger jetties and soil investigation for its approach roads at construction of precast r.c.c. jetty opposite of shyama jewellers shop
Read moreTopographical and hydrographical survey, sub-soil investigation for construction of precast rcc passenger jetties and soil investigation for its approach roads at diversion and extension of domkal jetty ghat over river thakuran
Read moreDetailed project report (dpr) including detailed, abstract estimate with data analysis as per prevailing schedule of rate, design and waterways vetting in connection with construction of rcc cart bridge on gorer kata khal
Read moreDetailed project report (dpr) including detailed, abstract estimate with data analysis as per prevailing schedule of rate, design and waterways vetting in connection with manirtat 2 no. to nataberia, nalua
Read moreDetailed project report (dpr) including detailed, abstract estimate with data analysis as per prevailing schedule of rate, design and waterways vetting in connection with construction of small bridge at paler chak
Read moreDetailed project report (dpr) including detailed, abstract estimate with data analysis as per prevailing schedule of rate, design and waterways vetting in connection with construction of small bridge at gobindapur muktoram sardar home
Read moreDetailed project report (dpr) including detailed, abstract estimate with data analysis as per prevailing schedule of rate, design and waterways vetting in connection with construction of rcc bridge madhabpur to gabtala
Read moreDetailed project report (dpr) including detailed, abstract estimate with data analysis as per prevailing schedule of rate, design and waterways vetting in connection with construction of 30 m. length of concrete bridge connecting nataberia
Read moreDetailed project report (dpr) including detailed, abstract estimate with data analysis as per prevailing schedule of rate, design and waterways vetting in connection with construction of r.c.c bridge near saraswati para at hokoldanga-i
Read moreof your Industry type