Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Balance Work Of Loading And Unloading Of P. Way Materials At Dsd/Raipur For The Period Of 12 Months.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 77050000 |
|
Reference Number |
E-R-T-59-24-25 |
| Tender Fee | 0 |
| EMD | 16200 |
| Tender Value | |
| Place | Bilaspur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/092024/77050000/viewNitPdf_4692383.pdf |
| Start Date | August 26, 2024 23:03 |
| End Date |
Expired
17/09/2024
Expired 632 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual rate contract for fixing of rate contract for storage handling, loading unloading, iron fabrication works etc in divisional store under the jurisdiction of ed jpdcl kishtwar for the year 2026-27 or till next tender is finalized
Annual rate contract for fixing of rate contract for storage handling, loading unloading, iron fabrication works etc in divisional store under the jurisdiction of ed jpdcl kishtwar for the year 2026-27 or till next tender is finalized
Read moreR/m of regulators/inlet gates for the year 2026-27.
Round the clock operation and watch and ward of 14 nos. regulators/inlet gates for a period of 04 months within nct of delhi under jurisdiction of flood circle-iii.
Read moreProviding electrification and street light (balance work) in sector-21 u/e kaithal. (including six years defect liability period for transformer and three years free mtc. and defect liability period for other items, free of cost) rate taken in dnit e
Providing electrification and street light (balance work) in sector-21 u/e kaithal. (including six years defect liability period for transformer and three years free mtc. and defect liability period for other items, free of cost) rate taken in dnit e
Read moreBalance work of slaughter houses at gujjar nagar and dogra hall, jammu
Balance work of slaughter houses at gujjar nagar and dogra hall, jammu
Read moreConstruction of 17 nos. forward bops (14 nos. company level and 3 nos. bops platoon level) in the state of tripura for border security force along indo-bangladesh border. sh:- c/o 2 nos. company level bop at simna-ii and old sewaram para including internal electrification, installation i/c compound lights service connecton to buildings. (package-ii) (balance work)
Read moreSe(d and p)/w and s/kmda /t-02 of 2026-27
Controlling of valves for flow adjustments, interconnection and synchronization of the pipe line net work under uttatpara-kotrong trans-municipal water supply scheme for 1 year.
Read moreConstruction of adr centre ...
Construction of adr centre at rewari district (replacement of switch installed for cctv only)(balance work only)
Read moreWork related to con of various makes of electromechanical relays to electronic type numerical relays and repair materials along with materials installed at various sub-stations in the jurisdiction of electricity test division-ghaziabad.
Work related to con of various makes of electromechanical relays to electronic type numerical relays and repair materials along with materials installed at various sub-stations in the jurisdiction of electricity test division-ghaziabad.
Read moreDevelopment of ultra modern...
Development of ultra modern apple, fruit and vegetable market at pinjore (phase-ii) balance road work
Read moreSupply, erection and civil package for extension of 400/220kv raipur (pg) s/s for installation of 1x500mva ict (4th) under the transmission scheme - augmentation of transformation capacity at 400/220kv raipur (pg) s/s by 400/220kv 1x500mva ict (4th) along with associated bays at both ends
Supply, erection and civil package for extension of 400/220kv raipur (pg) s/s for installation of 1x500mva ict (4th) under the transmission scheme - augmentation of transformation capacity at 400/220kv raipur (pg) s/s by 400/220kv 1x500mva ict (4th) along with associated bays at both ends
Read moreof your Industry type