Tender Details

Particulars Details
Title
Preparation Of Dpr For Construction Of Protection Wall In The Pond And R.C.C. Slab Over The Old Well In Ward Number 08, At Barhi
Description
Preparation Of Dpr For Construction Of Protection Wall In The Pond And R.C.C. Slab Over The Old Well In Ward Number 08, At Barhi
Organisation Directorate Urban Administration and Development | State Govt. and UT
Tender Id 2025_UAD_448473_1
Reference
Number
921/NP/2025
Tender Fee 1295
EMD 3000
Tender Value
Place Serivce
Link
View Original Tender Notice

https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=528598

Start Date September 03, 2025 20:00
End Date
Expired 20/09/2025

Expired 286 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Preparation of dpr (detailed project report) for construction of byepass in chhabra town consultancy services works.

Preparation of dpr (detailed project report) for construction of byepass in chhabra town consultancy services works.

Read more
Preparation of detailed project report (dpr) and tender documents for selection of an agency for construction of 5 mtpa coal washery at manoharpur coal mines

Preparation of detailed project report (dpr) and tender documents for selection of an agency for construction of 5 mtpa coal washery at manoharpur coal mines

Read more
Construction of retaining wall in pond area at akshra devi tempil block-dakore

Construction of retaining wall in pond area at akshra devi tempil block-dakore

Read more
Construction of safety wall and interlocking on the embankment of the pond in village tahla

Construction of safety wall and interlocking on the embankment of the pond in village tahla

Read more
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Supply installation testing and commissioning of 02nos 08 persons 544 kgs capacity gearless and machine room less new passenger lifts against replacement of existing old passenger lifts in abhigyan student hoste

Supply installation testing and commissioning of 02nos 08 persons 544 kgs capacity gearless and machine room less new passenger lifts against replacement of existing old passenger lifts in abhigyan student hostel at csir ccmb

Read more
Hariparvat zone, ward no. 10 work involving the construction of a drain wall and culvert, and the installation of a mesh screen over the drain at nala budhan sayyad (near the shaikh basti railway track and the municipal corporation girls inter coll

Hariparvat zone, ward no. 10 work involving the construction of a drain wall and culvert, and the installation of a mesh screen over the drain at nala budhan sayyad (near the shaikh basti railway track and the municipal corporation girls inter coll

Read more
Land development works and construction of precast boundary wall for setting up of cbg plant for bpcl at rajnandgaon, chhattisgarh

Land development works and construction of precast boundary wall for setting up of cbg plant for bpcl at rajnandgaon, chhattisgarh

Read more
Annual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).

Annual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise