Tender Details

Particulars Details
Title
Modfn Of Raw Mtrl Charging System From Existing Batching Controller System To Plc Based System
Description
Organisation Steel Authority of India Limited | Ministry of Steel
Tender Id GEM/2025/B/6251263
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date May 20, 2025 18:36
End Date
Expired 11/06/2025

Expired 492 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 14 Lakhs Experience with Gov. Required: Years
Buyer Name: Rahul Kunwar
Ministry: Ministry Of Steel
Department: Steel Authority Of India Limited
Organisation: Chandrapur Ferro Alloy Plant
Similar Tenders
Programmable logic controller (plc)

Programmable logic controller (plc)

Read more
Programmable logic controller (plc)

Programmable logic controller (plc)

Read more
Integration of a new 4-channel controller for the di4p test rig to replace the existing controller

Integration of a new 4-channel controller for the di4p test rig to replace the existing controller

Read more
Sitc of battery including buyback of old battery for the existing ups, lt panel plc and dg sets at sagardighi ssh, murshidabad.

Sitc of battery including buyback of old battery for the existing ups, lt panel plc and dg sets at sagardighi ssh, murshidabad.

Read more
Replacement of existing 6 inch dia ci raw water pipe by 8 inch dia di pipe of 2700 meter length at bjmd under the jurisdiction of sr. den(south)/ckp.

Replacement of existing 6 inch dia ci raw water pipe by 8 inch dia di pipe of 2700 meter length at bjmd under the jurisdiction of sr. den(south)/ckp.

Read more
Sitc of cold room enclosure,sitc of cold room evaporator and condensing unit,temperature controller and allied works,sitc of extra piping,removal of existing old cold room enclosure

Sitc of cold room enclosure,sitc of cold room evaporator and condensing unit,temperature controller and allied works,sitc of extra piping,removal of existing old cold room enclosure

Read more
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Read more
Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Construction of new bg electrified double line from km 15.670 to km 38.750, including thangarghat (new), dhourabhantha (new) and bhalumuda (existing) yards and stations, involving earthwork in formation, bridges, robs, rubs, service buildings, staff quarters, p-way works (including supply of ballast and p-way materials except rails), 2 x 25 kv ohe, psi, plc, electrical general works, signalling & telecommunication works along with allied and associated miscellaneous works, in connection wi

Read more
Supplying of 1.5tr inverter type split ac unit as per bee star rating 5star,installation of 1.5 tr split ac unit including fixing of indoor unit on wall outdoor on existing bracket,supplying and fixing of readymade stand for out door unit,dismantling the existing 1.5 tr split ac unit both indoor and outdoor,supplying and fixing of additional refrigerant copper pipe beyond standard length,supplying and fixing of 4core 2.5sq.mm. copper conductor cable,supplying and fixing of 25mm pvc drain pipe,supplying and fixing of wall mountable stabilizer,supplying and fixing of sequential cum thermostat ac unit controller for 2nos ac units

Supplying of 1.5tr inverter type split ac unit as per bee star rating 5star,installation of 1.5 tr split ac unit including fixing of indoor unit on wall outdoor on existing bracket,supplying and fixing of readymade stand for out door unit,dismantling the existing 1.5 tr split ac unit both indoor and outdoor,supplying and fixing of additional refrigerant copper pipe beyond standard length,supplying and fixing of 4core 2.5sq.mm. copper conductor cable,supplying and fixing of 25mm pvc drain pipe,supplying and fixing of wall mountable stabilizer,supplying and fixing of sequential cum thermostat ac unit controller for 2nos ac units

Read more
Upgradation of existing plc controller to pac rx3i plc system along with

Upgradation of existing plc controller to pac rx3i plc system along withhmi for fwph of darlipali.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise