Tender Details
Particulars | Details |
---|---|
Title |
Upgradation Of Industrial Area Malanpur Ghirongi (Roads), Dist. Bhind
|
Description |
Upgradation Of Industrial Area Malanpur Ghirongi (Roads), Dist. Bhind
|
Organisation | Government of Madhya Pradesh |
Tender Id | 2023_MIDCL_316264_1 |
Reference Number |
MPIDC/CE/Tech-RFP/2023/130 |
Tender Fee | 35400 |
EMD | 10 Lakh |
Tender Value | |
Place | MPIDC HO Bhopal |
Link | https://mptenders.gov.in |
Start Date | October 19, 2023 17:30 |
End Date |
20/11/2023 ( Expired 541 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction of major bridge over river umngot under nesids (roads)
Construction of major bridge including immediate approaches over river umngot on jongksha-kharang-dienglieng-nongjrong-moodymmai-wahiajer road, meghalaya under nesids (roads) (length - 110 m)
Read moreRehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Rehabilitation and upgradation of maharashtra mp border to tumsar section of nh 543k from km.51.000 to 69.000 to two lane with paved shoulder configuration in the state of maharashtra on epc mode total length 18.00 km
Read moreBharat coal gasification and chemicals limited ,bcgcl, a jv of cil and bhel, lstk4 tender for nitric acid and ammonium nitrate plant
Nitric acid and ammonium nitrate plant based on coal gasification for bharat coal gasification and chemicals limited, bcgcl, a jv of cil and bhel, at lakhanpur area of mahanadi coalfields limited, jharsuguda district, odisha
Read moreMaintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400 kv ss suryapet in yadadri-bhongirir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Maintaining the buildings, sweeping of roads and plucking of grass in switch yard area and maintaining the plants and lawns at 400kv ss suryapet in yadadri-bhongir district for the period from 01.06.2025 to 31.03.2026 in omc, nalgonda
Read moreIt addl pune infotech park ii industrial area rajiv gandhi infotech park phase ii... construction
It addl pune infotech park ii industrial area rajiv gandhi infotech park phase ii... construction&#x0d of flyover at laxmi chowk hinjawadi pune&#x0d
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreDevelopment of keshod airport, keshod (gujarat)
Detailed designing, engineering, procurement and construction of new domestic terminal building with parking, atc tower cum technical block, fire station, electrical sub-station, approach roads, ancillary structures, allied works and associated mep a
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation of nh 7538 from nandurbar to taloda to 4lps in the states of maharashtra-gujarat on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation of nh 7538 from nandurbar to taloda to 4lps in the states of maharashtra-gujarat on epc mode.
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreof your Industry type