Tender Details
Particulars | Details |
---|---|
Title |
Day To Day Shifting Of 4 Inch Dia Pipeline By Dismantling, Laying, Cutting, Jointing (Welding) Etc As Per Advancement Of Mine For Firefighting At Jamun Dohar And Repairing Of Existing Pipeline As And When Required For A Period Of One Year Under Kdh
|
Description |
Day To Day Shifting Of 4 Inch Dia Pipeline By Dismantling, Laying, Cutting, Jointing (Welding) Etc As Per Advancement Of Mine For Firefighting At Jamun Dohar And Repairing Of Existing Pipeline As And When Required For A Period Of One Year Under Kdh
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_327067_1 |
Reference Number |
GM (NK)/EnM/e-NIT/2024-25/ 208 |
Tender Fee | 0 |
EMD | 7400 |
Tender Value | |
Place | KDH OCP, NK Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339014 |
Start Date | January 29, 2025 16:30 |
End Date |
08/02/2025 ( Expired 71 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Installation, alignment and commissioning of pumps with sel engine and electric motor, laying of ms pipeline with flange welding, dismantling of ms pipes and other miscellaneous work for the purpose of dewatering, firefighting as per requirement.
Installation, alignment and commissioning of pumps with sel engine and electric motor, laying of ms pipeline with flange welding, dismantling of ms pipes and other miscellaneous work for the purpose of dewatering, firefighting as per requirement.
Read moreDay-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.
Day-to-day minor running maintenance/ repairing of pipelines, valves, flanges etc. at different locations of surface and mines premises on as and when required basis for a period of one year at dipka expansion project.
Read moreMaking of 6 inch dia ms pipeline (welding of flanges, shifting, laying and jointing of pipes) from part 2b to trs of chp 12 mty for supply of water to facilitate dust suppression under s.b. project.
Making of 6 inch dia ms pipeline (welding of flanges, shifting, laying and jointing of pipes) from part 2b to trs of chp 12 mty for supply of water to facilitate dust suppression under s.b. project.
Read moreKtps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Ktps-v-cam-transportation of material, t and p, ms erw pipes, various scrap material, ash, coal, silt and debris etc by engaging tractor (including carrier) from section store to ash pond / internal transportation from one spot to another spot at ash pond and inside plant premises as and when required as per the directions of in charge engineer at site, during the period from 01-04-2025 (or from actual date of utilization) to 31 -03 - 2026-reg.
Read moreDay to day repair and maintenance of 3.3kv ohtl and 440v ohtl by dismantling, erection, extension for supplying power to hemms, mine dewatering pumps and lighting installations for one year as and when required as per the advancement of mine under da
Day to day repair and maintenance of 3.3kv ohtl and 440v ohtl by dismantling, erection, extension for supplying power to hemms, mine dewatering pumps and lighting installations for one year as and when required as per the advancement of mine under da
Read moreAnnual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Annual contract for dismantling, shifting and re-commissioning etc and day to day running maintenance of 3 nos 500gpm pump-motor at phase ii colony and 4 nos 500 gpm pump-motor at kmp colony at akk ocp bnk area for a period of one years.
Read moreShifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of 6 inch dia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Shifting of 02 nos. diesel engine 1000 gpm pump in mine sump with dismantling of pipeline of inchdia ( 500 mtr. each approx.) and replacement of old suction pipe of both pump under amrapali ocp, a-c area
Read moreDismantling and di cum laying of 8 inch dia m.s. pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk area
Dismantling and di cum laying of 8 inch dia m.s. pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk area
Read moreDismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Dismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Read moreDismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Dismantling and laying of 250/300mm dia ms pipeline in main sump (turra) and purewa bottom coal face as when required during monsoon 2025 at bina project.
Read moreof your Industry type