Tender Details
Particulars | Details |
---|---|
Title |
Day To Day Shifting Of 4 Inch Dia Pipeline By Dismantling, Laying, Cutting, Jointing (Welding) Etc As Per Advancement Of Mine For Firefighting At Jamun Dohar And Repairing Of Existing Pipeline As And When Required For A Period Of One Year Under Kdh
|
Description |
Day To Day Shifting Of 4 Inch Dia Pipeline By Dismantling, Laying, Cutting, Jointing (Welding) Etc As Per Advancement Of Mine For Firefighting At Jamun Dohar And Repairing Of Existing Pipeline As And When Required For A Period Of One Year Under Kdh
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_327067_1 |
Reference Number |
GM (NK)/EnM/e-NIT/2024-25/ 208 |
Tender Fee | 0 |
EMD | 7400 |
Tender Value | |
Place | KDH OCP, NK Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=339014 |
Start Date | January 29, 2025 16:30 |
End Date |
08/02/2025 ( Expired 119 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Dismantling and laying of 8 inch dia m.s. pipeline required for extension of delivery pipeline of the 2000 g.p.m. pump motor set installed at the a patch in mine, involved in dewatering of the a patch, w.r.t. karo ocp, under bnk area
Read moreDismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Dismantling of 150mm dia pipeline and laying of pipeline (refer deion of work as per nit) and time to time shifting of 1000 gpm pump motor complete including all accessories in various location as and when req for a period of one year
Read moreLabour charges for dismantling and laying and jointing of 200mm dia ms pipeline in the quarry area of oc-iv section of pkoc, for one year period in manuguru area i.e., 2025-26, bhadradri kothagudem district, telangana. ( invited under earmarked works - sccl registered contractors belong to sc community are eligible to participate)
Labour charges for dismantling and laying and jointing of 200mm dia ms pipeline in the quarry area of oc-iv section of pkoc, for one year period in manuguru area i.e., 2025-26, bhadradri kothagudem district, telangana. ( invited under earmarked works - sccl registered contractors belong to sc community are eligible to participate)
Read moreDay to day maintenance of existing 6 inch dia pipeline with pump shifting/pipe shifting from 42 no. querry to prem nagar filter plant for the period of one year of peocp under hazaribag area
Day to day maintenance of existing 6 inch dia pipeline with pump shifting/pipe shifting from 42 no. querry to prem nagar filter plant for the period of one year of peocp under hazaribag area
Read moreCross jointing 40 nos by hot vulcanizing process in steel cord belting st 2000 1200 mm width in c4 conveyor of rls bocp as and when required for a period of one year
Cross jointing 40 nos by hot vulcanizing process in steel cord belting st 2000 1200 mm width in c4 conveyor of rls bocp as and when required for a period of one year
Read moreShifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level
Shifting of one pump of 1000 gpm, make kirloskar oil engines oil engines itd. from one place to other place at same location for laying and welding of 100 mtrs. 6 inch dia. pipe suction and delivery side of the pump due to decreased water level
Read moreDismantling, shifting and laying of pipeline of 6 inch dia ( 800m approx.) as per requirement with priming arrangement and replacement of different types of damaged valves in existing pipelines at amrapali ocp under a-c area
Dismantling, shifting and laying of pipeline of 6 inch dia ( 800m approx.) as per requirement with priming arrangement and replacement of different types of damaged valves in existing pipelines at amrapali ocp under a-c area
Read moreCross jointing by hot vulcanizing process in steel cord belting st 2000 1200 mm width in c4 conveyor of rls bocp as and when required for a period of one year
Cross jointing by hot vulcanizing process in steel cord belting st 2000 1200 mm width in c4 conveyor of rls bocp as and when required for a period of one year
Read moreShifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Shifting installation commissioning pump as well as laying fitting dismantling of different size pipeline extension shortenging of delivery pipes as per requirement depending water level up and down of sump water of bharatpur ocp for one year
Read moreLaying of two nos. 8 inch dia delivery range and two nos. 10 inch dia delivery range from jehlitand sump to sona dubha nallah and dismantling of existing four nos. of delivery range for clearing the dumping area under kdh ocp, nk area
Laying of two nos. 8 inch dia delivery range and two nos. 10 inch dia delivery range from jehlitand sump to sona dubha nallah and dismantling of existing four nos. of delivery range for clearing the dumping area under kdh ocp, nk area
Read moreof your Industry type