⚡️electricity Distribution Sub Division Dhanaura Project Opportunity⚡️ Paschimanchal Vidyut Vitran Nigam Ltd., A State Government Undertaking, Is Seeking Bids For The Management Of New Electrical Connections, Load Adjustments, And Other Operational Tasks Within The Deposit Scheme Framework At S.E. Edc Amroha. 📅 Bid Submission Deadline: May 17, 2024, 1:00 Pm Tender Fee: Inr 1180 Emd: Inr 2000 Interested Bidders Should Possess Expertise In Managing Electrical Distribution Systems And Be Prepared To Handle The Dynamic Requirements Of New Connections And Load Management. Detailed Proposals, Including Technical Capabilities And Financial Bids, Are Expected. Keywords: Electricity Distribution, New Connections, Load Management, Paschimanchal Vidyut Vitran Nigam Ltd, State Govt. And Ut, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Work Of Release The Different New Connection, Increase And Decrease Load Etc. (Running) In Deposit Scheme Under Electricity Distribution Sub Division Dhanaura.
|
| Description |
Work Of Release The Different New Connection, Increase And Decrease Load Etc. (Running) In Deposit Scheme Under Electricity Distribution Sub Division Dhanaura.
|
| Organisation | Paschimanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
| Tender Id | 2024_PVVNL_900160_1 |
|
Reference Number |
T-67/2023-24/EDCA |
| Tender Fee | 1180 |
| EMD | 2000 |
| Tender Value | - |
| Place | S.E. EDC AMROHA |
| Link |
View Original Tender Notice
https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1598551 |
| Start Date | May 25, 2024 23:30 |
| End Date |
Expired
07/06/2024
Expired 862 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Work of enchacement of 200 kva sapna habitat dtc to 400 kva in order to release 29 nos of ltd service connection for a total load of 230 kw sucorro bardez goa under the jurisidiction of sub division ii porvorim division vi mapusa
Work of enchacement of 200 kva sapna habitat dtc to 400 kva in order to release 29 nos of ltd service connection for a total load of 230 kw sucorro bardez goa under the jurisidiction of sub division ii porvorim division vi mapusa
Read moreTender for the work of erection of 200 kva for a.p.s to 2 nos. of ltds ii service connection to smt. m.d. gosavi and smt. l.a. gaonkar at gaonkarwada bicholim, for total load of 15.06 kw, in the jurisdiction so bicholim, under sd i, bicholim
Tender for the work of erection of 200 kva for a.p.s to 2 nos. of ltds ii service connection to smt. m.d. gosavi and smt. l.a. gaonkar at gaonkarwada bicholim, for total load of 15.06 kw, in the jurisdiction so bicholim, under sd i, bicholim
Read moreProviding service connection as per procedures b 2010 to the housing project namely prysm lake view at jatragachi near subhash bose institute at baguiati customer care centre
Providing service connection as per procedures b 2010 to the housing project namely prysm lake view at jatragachi near subhash bose institute at baguiati customer care centre
Read moreThe work of erection of 1 nos of 200 kva dtcs along with rmus ht underground cables in order to release p s to the president fabrica da igreja da taleigao at sy no 17 185 a 1 17 185 a2 17 185 a 3 17 185 a 4 taleigao for a connected load of 85 kw
The work of erection of 1 nos of 200 kva dtcs along with rmus ht underground cables in order to release p s to the president fabrica da igreja da taleigao at sy no 17 185 a 1 17 185 a2 17 185 a 3 17 185 a 4 taleigao for a connected load of 85 kw
Read moreCasting of psc slabs from 3.05 m to 12.2 m and ballast retainers as per approved drawings and development of psc slab casting yard at engineering workshop sini in connection with strengthening/rehabilitation/re-construction/re-girdering of existing bridges for running of 25t axle load in ser to achieve 3000mt mission.
Casting of psc slabs from 3.05 m to 12.2 m and ballast retainers as per approved drawings and development of psc slab casting yard at engineering workshop sini in connection with strengthening/rehabilitation/re-construction/re-girdering of existing bridges for running of 25t axle load in ser to achieve 3000mt mission.
Read moreWork of release the different new connection, increase and decrease load etc. (running) in deposit scheme under electricity distribution division sambhal
Work of release the different new connection, increase and decrease load etc. (running) in deposit scheme under electricity distribution division sambhal
Read moreWork of release the different new connection, increase and decrease load etc. (running) in deposit scheme under electricity distribution sub division-gajraula.
Work of release the different new connection, increase and decrease load etc. (running) in deposit scheme under electricity distribution sub division-gajraula.
Read moreWork of release the different new connection, increase and decrease load etc. (running) in deposit scheme under electricity distribution sub division-bachraun.
Work of release the different new connection, increase and decrease load etc. (running) in deposit scheme under electricity distribution sub division-bachraun.
Read moreWork of release the different new connection, increase and decrease load etc. running in deposit scheme under electricity distribution division-ii, amroha.
Work of release the different new connection, increase and decrease load etc. running in deposit scheme under electricity distribution division-ii, amroha.
Read moreWork of release the different new connection, increase and decrease load etc. running in deposit scheme under electricity distribution division-i, amroha.
Work of release the different new connection, increase and decrease load etc. running in deposit scheme under electricity distribution division-i, amroha.
Read moreof your Industry type