Tender Details
Particulars | Details |
---|---|
Title |
Supply, Erection And Commissioning Of Complete Set Of Hydrastep For St 2 Units Ntpc Singrauli
|
Description |
Supply, Erection And Commissioning Of Complete Set
Of Hydrastep For St 2 Units Ntpc Singrauli
|
Organisation | NTPC Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 50000 |
Tender Value | |
Place | NTPC Singrauli, Shaktinagar, Sonebhadra, UP |
Link |
AAAAAAAAAA Login to view |
Start Date | April 22, 2025 23:35 |
End Date |
03/05/2025 ( 9 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Read moreProcurement of consumables for agilent make dga and atomic absorption spectrophotometer at ntpc mouda
Procurement of consumables for agilent make dga and atomic absorption spectrophotometer at ntpc mouda
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreChartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Read moreTender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Tender for chartering of green tug (green tug transition programme compliant) manning, operation, maintenance and complete technical management of 02 nos. 60 ton bollard pull capacity new battery electric tug for a period of 15 years at jnpa
Read moreDesign manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreDesign, support, supply, installation and commissioning, training, warranty and amc of medical cyclotron with turnkey
Design, support, supply, installation and commissioning, training, warranty and amc of medical cyclotron with turnkey (complete scope as per the attached document in specification)
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreof your Industry type