Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Installation Of Solar Lights In Various Villages In District Pathankot (Under Mp Lad Scheme) (2 N Os. Village)
|
Description |
Installation Of Solar Lights In Various Villages In District Pathankot (Under Mp Lad Scheme) (2 N Os. Village)
|
Organisation | CE-PWD(B and R) | State Govt. and UT |
Tender Id | 2025_CEPW_137278_1 |
Reference Number |
Bid No. 33 Dated 24-03-2025 (Solar Light 2 No. Village) |
Tender Fee | 2755 |
EMD | 12800 |
Tender Value | |
Place | PATHANKOT |
Link | https://eproc.punjab.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=277320 |
Start Date | March 25, 2025 14:30 |
End Date |
01/04/2025 ( Expired 77 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
2 and 4 lanning of damoh jabalpur (pkg1) section of nh34 from km. 0.000 to 43.500 under nh (o) in the state of madhya pradesh on epc mode
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.
Read moreWidening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreRepair and maintenance of primary health care centre at mimi village of kiphire district in nagalan
Repair and maintenance of primary health care centre at mimi village of kiphire district in nagalan
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreConst. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Const. of 2 n 4 lane with paved shoulder from design km 114.000 near ashapur vill to design km 149.000 near rudhy vill sec of nh347b of betul khandwa pkg4 in madhya pradesh (design length 35.000 km) on ham under nh (o)
Read moreSelection of developers for installing rooftop solar plants on buildings of various departments (law justice, jal shakti, irrigation flood control, forest, ecology environment, and home) in ut of j and k through jakeda in resco mode.
Selection of developers for installing rooftop solar plants on buildings of various departments (law and justice, jal shakti, irrigation aflood control, forest, ecology and environment, and home) in ut of j and k through jakeda in resco mode.
Read moreConstruction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Construction of 2 nos of 220 kv bays at 400kv gss alwar (ppp) for termination already approved 220 kv dc line from under construction 220 kv gss sikri to 400 kv gss alwar (ppp) including survey, supply and etc on turnkey basis under bn-9018002512
Read moreImplementation of 500mw with a 50 persantage greenshoe option, for grid connected roof top solar pv systems under resco model at various locations in the state of maharashtra, goa, gujarat, uttar pradesh and andhra pradesh
Implementation of 500mw with a 50 persanatge greenshoe option, for grid connected roof top solar pv systems under resco model at various locations in the state of maharashtra, goa, gujarat, uttar pradesh and andhra pradesh
Read moreof your Industry type