Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Hardner For Top Coating Paint,Str No
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106410277 |
|
Reference Number |
58245040B |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Allahabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/082024/106410277/viewNitPdf_4643980.pdf |
| Start Date | July 16, 2024 17:16 |
| End Date |
Expired
06/08/2024
Expired 797 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of powder coating powder light grey structure mat shade 631 of is-5 ,
Supply of powder coating powder light grey structure mat shade 631 of is-5 ,
Read moreFacelifting of vip 1 and allied buildings including emulsion paint, synthetic paint, polishing at wazarat road, jammu. cno-347 np (2nd call)
Facelifting of vip 1 and allied buildings including emulsion paint, synthetic paint, polishing at wazarat road, jammu. cno-347 np (2nd call)
Read moreCarrying out repairs for strengthening, sandblasting and painting with anti-corrosive coating for intake service gates of unit # 5 (two gates) and painting of stop log gates (22 elements) and lifting beam of mono rail hoist available at intake gates of pjhes with anti-corrosive paint
Carrying out repairs for strengthening, sandblasting and painting with anti-corrosive coating for intake service gates of unit # 5 (two gates) and painting of stop log gates (22 elements) and lifting beam of mono rail hoist available at intake gates of pjhes with anti-corrosive paint
Read moreRoof top rain water harvesting work for type-3 houses in chitrakoot district
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Read moreStructural painting, roof sheet replacement and providing gi strips grid on top for strengthening attachment of profile sheets with structure in prrpl mlpu/bpu shed and phbmpl mlpu shed at ppl paradip station
Structural painting, roof sheet replacement and providing gi strips grid on top for strengthening attachment of profile sheets with structure in prrpl mlpu/bpu shed and phbmpl mlpu shed at ppl paradip station
Read moreOn-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site resin grouting work for slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreOn-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
On-site laser measurement work on slew bearing seating area (top and bottom surfaces) of trf make stacker/reclaimer machine in chp of ktps-v and vi stages during the replacement of slew bearing
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreof your Industry type