Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Diversion, Dismantling, Erection Of 6.6 Kv Sfi Power Supply Installation Of 4000 Gpm Pump Deco Patch Of Abocp Mine
|
| Description |
Diversion, Dismantling, Erection Of 6.6 Kv Sfi Power Supply Installation Of 4000 Gpm Pump Deco Patch Of Abocp Mine
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_BCCL_287580_1 |
|
Reference Number |
GM/B-II/AM (ENM)/E-TENDER/2023-24/155 dt 30.08.23 |
| Tender Fee | |
| EMD | 1300 |
| Tender Value | |
| Place | General Manager Office, Block-II Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 02, 2023 14:30 |
| End Date |
Expired
12/09/2023
Expired 1018 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Dismantling and shifting of existing lt panels and restoration of power supply at 3rd floor cuffeparade te building mtnl mumbai.
Dismantling and shifting of existing lt panels and restoration of power supply at 3rd floor cuffeparade te building mtnl mumbai.
Read moreRestoration of the fire fighting system including replacement of the defective 1.1 kv lt power cable from ess to the fire pump house with allied works at icp jogbani bihar.
Restoration of the fire fighting system including replacement of the defective 1.1 kv lt power cable from ess to the fire pump house with allied works at icp jogbani bihar.
Read moreErection of 25kva transformer and necessary electric installation for giving electric supply to 55 kld stp fixed in glr sy no. 129, belagavi cantonment.
Erection of 25kva transformer and necessary electric installation for giving electric supply to 55 kld stp fixed in glr sy no. 129, belagavi cantonment.
Read moreErection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrrangement at topa ocp under kuju area.
Erection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrangement at topa ocp under kuju area.
Read moreGeneral general supply installation testing and commissioning of service lift in the pwd rest house pathadippalam ernakulam providing service lift electrical lift work general civil work
In this work various items such as dismantling tile work in floors and roof,demolishing brick work,provision for providing and laying polished granite stone flooring for gf and 3 floors,provision for solid block masonry using pre cast solid blocks
Read moreDesign, engineering, supply, installation and commissioning of 757 kwp / 742 kw or above capacity on-grid rooftop solar power plant on 11 identified buildings
Design, engineering, supply, installation and commissioning of 757 kwp / 742 kw or above capacity on-grid rooftop solar power plant on 11 identified buildings
Read moreRepair maint of water supply installation including rewinding of motors delta starter and connected works in various pump houses and water point at rms and rajbari
Repair maint of water supply installation including rewinding of motors delta starter and connected works in various pump houses and water point at rms and rajbari
Read moreDesign, supply, installation, testing and commissioning of entire pipeline system from mph to s-4 and from s-4 pump house to connected branches sprinkling system and automation using of self dynamic hydro control val
Design, supply, installation, testing and commissioning of entire pipeline system from mph to s-4 and from s-4 pump house to connected branches 
 sprinkling system and automation using of self dynamic hydro control val
Read moreSupply, erection and civil package for extension of 400/220kv raipur (pg) s/s for installation of 1x500mva ict (4th) under the transmission scheme - augmentation of transformation capacity at 400/220kv raipur (pg) s/s by 400/220kv 1x500mva ict (4th) along with associated bays at both ends
Supply, erection and civil package for extension of 400/220kv raipur (pg) s/s for installation of 1x500mva ict (4th) under the transmission scheme - augmentation of transformation capacity at 400/220kv raipur (pg) s/s by 400/220kv 1x500mva ict (4th) along with associated bays at both ends
Read moreSurvey, design, fabrication, supply, installation, testing, commissioning with rms of 10 kw cap. of grid connected spv power plant with hybd inverter (4 hrs battery back-up) with 5 years cmc at govt.ashram school, korta ta. umerkhed, dist. yavatmal
Survey, design, fabrication, supply, installation, testing, commissioning with rms of 10 kw cap. of grid connected spv power plant with hybd inverter (4 hrs battery back-up) with 5 years cmc at govt.ashram school, korta ta. umerkhed, dist. yavatmal
Read moreof your Industry type