Tender Details

Particulars Details
Title
First Time Repairing Of The Following 23 Nos Stopping Of Cm Panel 10 And 11 And 22 And Trunk Panel Of Rvi Seam At Mic Unit Under Jhanjra Project Colliery
Description
First Time Repairing Of The Following 23 Nos Stopping Of Cm Panel 10 And 11 And 22 And Trunk Panel Of Rvi Seam At Mic Unit Under Jhanjra Project Colliery
Organisation Eastern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_ECL_330752_1
Reference
Number
ECL/GM/JNR/MIN.A/24-25/58 Dt. 28.02.2025
Tender Fee 0
EMD 4400
Tender Value -
Place Jhanjra Project Colliery
Link
View Original Tender Notice

https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342842

Start Date March 04, 2025 16:30
End Date
Expired 13/03/2025

Expired 580 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Proposal for rimming 01no bore hole from surface to rvi seam for dewatering at mic jpc

Proposal for rimming 01no bore hole from surface to rvi seam for dewatering at mic jpc

Read more
Proposal for cleaning of 02 no existing bore hole from surface to rvi seam for cable lowering at mic jpc

Proposal for cleaning of 02 no existing bore hole from surface to rvi seam for cable lowering at mic jpc

Read more
Construction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.

Construction of 37 nos. isolation stopping in g-iiib seam p-1 panel of bagdewa ug mine.

Read more
Construction of 03 nos sectionalisation stoppings between trunk panel and panel 8a of rvii seam at 3 and 4 unit under jpc

Construction of 03 nos sectionalisation stoppings between trunk panel and panel 8a of rvii seam at 3 and 4 unit under jpc

Read more
Proposal for cleaning slurry debris along 48d plus 1 l to 47d plus 1 l in r v seam at mic unit of jhanjra project colliery

Proposal for cleaning slurry debris along 48d plus 1 l to 47d plus 1 l in r v seam at mic unit of jhanjra project colliery

Read more
Construction of 14 numbers of isolation stopping in k-12 panel (sub panel k-12a and k-12b) in r-iv seam at khottadih colliery, pandaveswar area.

Construction of 14 numbers of isolation stopping in k-12 panel (sub panel k-12a and k-12b) in r-iv seam at khottadih colliery, pandaveswar area.

Read more
Construction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.

Construction of 29 nos. of 50cm thick rcc isolation stopping to isolate 7ln,23ls(ii) and main dip proposed lhcm panel in seam a at kurja ug mine of hasdeo area.

Read more
First time repairing of the following 14 nos of ventilation stopping at sector c and sector d of cm panel of r vi seam at mic unit under jhanjra project colliery

First time repairing of the following 14 nos of ventilation stopping at sector c and sector d of cm panel of r vi seam at mic unit under jhanjra project colliery

Read more
Drilling of upward borehole for longwall panel 13 from rvi seam to rviia seam at mic unit of jhanjra project colliery

Drilling of upward borehole for longwall panel 13 from rvi seam to rviia seam at mic unit of jhanjra project colliery

Read more
Construction of 10 nos ventilation stopping at trunk panel t 5 of rv seam at mic under jpc

Construction of 10 nos ventilation stopping at trunk panel t 5 of rv seam at mic under jpc

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise