Tender Details
Particulars | Details |
---|---|
Title |
Providing And Laying Of Renewal Coat Including Other Allied Works On Road From Fazalabad To Marhote Package No. Jk11 108 Stage Ii Block Surankote And District Poonch Length 8.000 Kms. (3rd Call)
|
Description |
Providing And Laying Of Renewal Coat Including Other Allied Works On Road From Fazalabad To Marhote Package No. Jk11 108 Stage Ii Block Surankote And District Poonch Length 8.000 Kms. (3rd Call)
|
Organisation | National Rural Roads Development Agency (NRRDA) | Central Govt. Ministry/Department |
Tender Id | 2024_JKRRD_137878_1 |
Reference Number |
e-NIT No. 12/EE/PMGSY/POONCH OF 2024-25 DATED 07.12.2024 |
Tender Fee | 3000 |
EMD | 5.19 Lakh |
Tender Value | |
Place | Surankote |
Link | https://pmgsytendersjk.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=215882 |
Start Date | December 09, 2024 22:30 |
End Date |
27/12/2024 ( Expired 115 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Providing and laying premix carpet on internal road of township complex at nagwain of parbati-h.e. project (stage-ii) (package no-c-811)
Providing and laying premix carpet on internal road of township complex at nagwain of parbati-h.e. project (stage-ii) (package no-c-811)
Read moreWbphed/ee/td/niet_24_2024_2025 (2nd call)
Laying of distribution pipe line by hdpe pipes after re-desing lds drawing with allied works of taladiha and its adjoining moujas pwss in patashpur-i block under contai sub-division of tamluk division, phe dte. purba medinipur district.
Read moreProviding, laying and compaction of bituminious ready mix (hmp) concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer between km 0.000 to km 18.825 (net linear length 18.783 km) on road walong - helmet top
Providing, laying and compaction of bituminious ready mix (hmp) concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer between km 0.000 to km 18.825 (net linear length 18.783 km) on road walong - helmet top
Read moreProviding, laying and compaction of bituminous concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer km 0.000 to km 12.000 (net linear length 11.645 km) on road meshai - dichu (2n call)
Providing, laying and compaction of bituminous concrete 30 mm thick after applying tack coat including correction works with bm 50 mm thick layer km 0.000 to km 12.000 (net linear length 11.645 km) on road meshai - dichu (2n call)
Read moreNit no 120
Providing, laying, jointing, testing and commissioning of 63 &amp 75 mm dia hdpe pe-100, pn-6 2100.00mtr.&amp 65 mm dia g.i. pipe 25.00mtr. &amp providing connection in house hold and public institutions 21 nos with valve specials and all fitting i/c all allied civil works complete with 06 months trial operation &amp maintanace for 06 months. and at village matasi, block-bhairamgarh, district - bijapur. under jal jeevan mission - single village scheme. ( 2nd call )
Read moreNit no 118
Providing, laying, jointing, testing and commissioning of 63 &amp 75 mm dia hdpe pe-100, pn-6 1820mtr.&amp 65 mm dia g.i. pipe 23 mtr.&amp providing connection in house hold and public instiutions-21 nos with valve specials and all fitting i/c all allied civil works complete with 06 months trial operation &amp maintanace for 06 months. and at village -mardingpal, block-bhairamgarh, district - bijapur. under jal jeevan mission - single village scheme.(2nd call)
Read moreNit no 119
Providing, laying, jointing, testing and commissioning of 63 &amp 75 mm dia hdpe pe-100, pn-6, 1725 mtr.&amp 65 &amp80mm dia g.i. pipe 24mtr. and providing connection in house hold and public instiutions-21nos with valve specials and all fitting i/c all allied civil works complete with 06 months trial operation &amp maintanace for 06 months. and at village -bandemarka, block- bhairamgarh, district - bijapur. under jal jeevan mission &ndash single village scheme (2nd call)
Read more34/tendercell/ce/phed/raipur date 07-03-2025
Design, drawing, construction, testing, commissioning of intake well, raw water pumps and motors, unconventional water treatment plant, clear water pumps and motors, providing, laying, jointing and testing &amp commissioning of raw water &amp clear water pumping main of di k-9 pipe, with all required valves &amp specials, all allied civil works etc., including trial of entire scheme for 6 month after completion of all components with defect liabilities period of 1 year under water supply arrangement for central reserve police force camp at bhilai, block-arang, district: raipur. source- mahanadi river (nisda anicut)
Read moreNit no 128 date 28.03.2025
Providing, laying, jointing, testing and commissioning of 63 &amp 75 mm dia hdpe pe-100, pn-6, 2010.00 mtr.&amp 65&amp80 mm dia g.i. pipe 00.00 mtr., providing connection in house hold and public instiutions-29nos with valve specials and all fitting i/c all allied civil works complete with 06 months trial operation &amp maintenance for 06 months. and at village bandeparre, block-bhopal patnam, district - bijapur. under jal jeevan mission &ndash single village scheme (5th call )
Read moreNit no 125 date 28.03.2025
Providing, laying, jointing, testing and commissioning of 63 &amp 80 mm dia hdpe pe-100, pn-6, 1750.00 mtr.&amp 65 mm dia g.i. pipe 00.00 mtr., providing connection in house hold and public instiutions-15nos with valve specials and all fitting i/c all allied civil works complete with 06 months trial operation &amp maintenance for 06 months. and at village-fandiwaya, block-bhopal patnam, district - bijapur. under jal jeevan mission &ndash single village scheme (3rd call )
Read moreof your Industry type