Tender Details

Particulars Details
Title
Hanger Exhibition Set Up For Foundation Stone Laying Ceremony Of Armp Varanasi On 23 Feb 2024
Description
Hanger Exhibition Set Up For Foundation Stone Laying Ceremony Of Armp Varanasi On 23 Feb 2024
Organisation Bharat Heavy Electricals Limited | Central Govt. Ministry/Department
Tender Id 2024_BHEL_746495_2
Reference
Number
AA GAX 23 EV 102
Tender Fee 0
EMD 0
Tender Value -
Place Varansi
Link
View Original Tender Notice

https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1049677

Start Date February 19, 2024 16:30
End Date
Expired 20/02/2024

Expired 969 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of inauguration foundation stone of various works under the jurisdiction of pwd division nowshera stage contract

Construction of inauguration foundation stone of various works under the jurisdiction of pwd division nowshera stage contract

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Bhoomi pooja and foundation stone laying ceremony

Organizing bhoomi pooja and foundation stone laying ceremony at tirupati

Read more
Saksham closure ceremony on 28th feb

Saksham closure ceremony on 28th feb

Read more
Construction of a wall for stone plaque installation of foundation ceremony of central university of kerala

Construction of a wall for stone plaque installation of foundation ceremony of central university of kerala

Read more
Supply, installation arrangement of various construction, supply, installation, of various components items viz, pedestal inauguration/foundation, shamiyana, seating arrangement, etc. stone for inauguration foundation stone laying ceremony of various

Supply, installation arrangement of various construction, supply, installation, of various components items viz, pedestal inauguration/foundation, shamiyana, seating arrangement, etc. stone for inauguration foundation stone laying ceremony of various

Read more
Conducting the foundation stone inauguration ceremony of various development works at sangareddy municipal office under municipal general funds 2025-26.

Conducting the foundation stone inauguration ceremony of various development works at sangareddy municipal office under municipal general funds 2025-26.

Read more
Dre023d188 event management for venue and stage management for foundation stone laying ceremony for digboi refinery 1.0 mmtpa expansion project

Dre023d188 event management for venue and stage management for foundation stone laying ceremony for digboi refinery 1.0 mmtpa expansion project

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise