Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Cc Road , Floor And Rcc Drain Near Khermata Mandir At Ward No.12 Of Nagar Parishad Bilhara
|
Description |
Construction Of Cc Road , Floor And Rcc Drain Near Khermata Mandir At Ward No.12 Of Nagar Parishad Bilhara
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 2295 |
EMD | 10120 |
Tender Value | |
Place | NAGAR PARISHAD BILHARA |
Link |
AAAAAAAAAA Login to view |
Start Date | May 07, 2025 16:00 |
End Date |
09/06/2025 ( 32 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreConstruction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Construction of fob at km 6.420 (amity university), grade separated structures/flyover at km 7.965 and 8.075 (riico kant kalwar), 11.780 (achrol) and 25.300 (kukas) with slip road on nh-248 for rectification of identified blackspots/accident spots in
Read moreDesign and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Design and construction of rail over bridge (rob) between railway km 71.9 and 72.0 between laxmi bai nagar station and mangliya railway stations along mr-10 road indore
Read moreConstruction of railway rob at km. 3.485 along parali bypass road on nh 548b in the state of maharashtra. work under contractors risk and cost.
Construction of railway rob at km. 3.485 along parali bypass on deogaon fata _pathari _sonpeth_parali_ambajogai_renapur fata_latur_omerga road nh 548b in the state of maharashtra. work under contractors risk and cost.
Read moreConstruction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara
Construction of cc road , floor and rcc drain near khermata mandir at ward no.12 of nagar parishad bilhara
Read moreConst. cc road and rcc drain ward no 18 muncipal area chhatarpur
Const. cc road and rcc drain ward no 18 muncipal area chhatarpur
Read moreConst. cc road and rcc drain ward no 19 muncipal area chhatarpur
Const. cc road and rcc drain ward no 19 muncipal area chhatarpur
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of wbm road over dyke top and ramp of the ash pond at sgtpp, wbpdcl.
Construction of wbm road over dyke top and ramp of the ash pond at sgtpp, wbpdcl.
Read moreUpgradation of rural road from sh connection (near shree rama temple) to sipu and laxmi priya bazar at hut bay
Upgradation of rural road form sh connection (near shree rama temple) to sipu and laxmi priya bazar at hut bay, south andaman under pmgsy-iii, batch-i, 2024-25 (package no an01hb23, length 1.372 km)
Read moreof your Industry type