Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Drilling Of Two(2) Numbers Ldtw(elec.) Block Krishnagar I, Under Krishnagar Ii(a I) Division.
|
| Description |
Re Drilling Of Two(2) Numbers Ldtw(elect.) At Assannagar Bhimpur(west)(648 Ii)ldtw Cluster(district Nadia, Block Krishnagar I, Mouza Assannagar, J.L. No 126, Plot No 2831, 2871, Under Krishnagar I (A I) Sub Division Under Krishnagar Ii(a I) Div
|
| Organisation | WATER RESOURCES DEV. DTE. | State Govt. and UT |
| Tender Id | 2025_WRDD_829234_3 |
|
Reference Number |
WBWRDD/Krishnagar-II(A-I) Divn/e- NIT14/2024-25 |
| Tender Fee | 0 |
| EMD | 7775 |
| Tender Value | - |
| Place | Krishnagar-I |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1846518 |
| Start Date | March 19, 2025 23:25 |
| End Date |
Expired
26/03/2025
Expired 565 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Providing re-drilling flushing and deepening of existing borewell and erection of submersible motor at ward no. 29 mullai nagar in hosur city municipal corporation
Providing re-drilling flushing and deepening of existing borewell and erection of submersible motor at ward no. 29 mullai nagar in hosur city municipal corporation
Read moreM/o park/green belt with two year maintenance sector-26 and 27 noida including re grassing work parks/green belt noida
M/o park/green belt with two year maintenance sector-26 and 27 noida including re grassing work parks/green belt noida
Read moreAnnual plan-annual plan chalissery gp 2026- 27, pro no 66 kulathani ambalam road re concreeting two side interlocking-work- general civil work
Annual plan-annual plan chalissery gp 2026- 27, pro no 66 kulathani ambalam road re concreeting two side interlocking-work- general civil work
Read moreCarrying out re-routing of existing 10.75 inch od pipe section of paradip raipur ranchi pipeline prrpl by horizontal directional drilling hdd method at ch. 116 km saraipalli korba section in chhattisgarh
Carrying out re-routing of existing 10.75 inch od pipe section of paradip raipur ranchi pipeline prrpl by horizontal directional drilling hdd method at ch. 116 km saraipalli korba section in chhattisgarh
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreHiring of 2.3 cu.m bucket capacity front end loader for re-handling of coal and sand at ktk-1 gr mines (ktk-1, 5 and 6), bhupalpalli area for a period of two years with 6000 working hours - reg.
Hiring of 2.3 cu.m bucket capacity front end loader for re-handling of coal and sand at ktk-1 gr mines (ktk-1, 5 and 6), bhupalpalli area for a period of two years with 6000 working hours - reg.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreLifting and re-lowering of submersible motor pumpalong with accessories in ldtw under tehatta (a-i) sub- division under krishnagar-i (a-i) division (2025-2026).
Lifting and re-lowering of submersible motor pumpalong with accessories in ldtw under tehatta (a-i) sub- division under krishnagar-i (a-i) division (2025-2026).
Read moreof your Industry type