Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Gorakhpur Mech. W/Shop &Amp Store Depot Ctr(s) 9.669 Tkm, Trr(s) 1.141 Tkm &Amp Tsr(s) 0.886 Tkm
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73721502 |
|
Reference Number |
NER-LJN-2024-15 |
| Tender Fee | 0 |
| EMD | 2.54 Lakh |
| Tender Value | - |
| Place | Gorakhpur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/032024/73721502/viewNitPdf_4487635.pdf |
| Start Date | March 01, 2024 22:35 |
| End Date |
Expired
27/03/2024
Expired 933 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,
Open e-tender for complete track renewal/through sleeper renewal work of 53.9 tkm with own pqrs machine & 5.72 tkm by manual, total= 59.62 tkm.(under senior divisional engineer/i/malda- manual ctr(p)- 4.252 tkm, by machine-1 tkm; senior divisional engineer/ii/malda- ctr(p) by machine- 13 tkm, manual ctr(p) 0.375 tkm, tsr(p) by machine-3.200 tkm manual tsr(p) 0.3 tkm and senior divisional engineer/iii/malda- ctr(p) by machine- 8 tkm, manual ctr(p) 0.398 tkm, tsr(p) by machine- 28.7 tkm,
Read moreS&t work in connection with (a) bhagalpur - dumka (sl) - ctr(p) - 13.375 tkm (b) jamalpur - munger & y-leg (sl) - ctr(p) - 8.398 tkm & azimganj - new farakka (dn) - ctr(p) - 1 tkm, (c) mandar hill - hansdiha (sl) - trr(p) - 21.712 tkm, (d) bhagalpur - jamalpur (up & dn) - tsr(p) - 23.01 tkm, (e) malda division - tsr(p) - 9.585 tkm, (f) bhagalpur - kiul & bhagalpur - dumka - ttr (tws + wcmsc) - 80 sets (1 in 12 - 77 sets and 1 in 8.5 - 3 sets), (g) azimganj - new farakka - t
S&t work in connection with (a) bhagalpur - dumka (sl) - ctr(p) - 13.375 tkm (b) jamalpur - munger & y-leg (sl) - ctr(p) - 8.398 tkm & azimganj - new farakka (dn) - ctr(p) - 1 tkm, (c) mandar hill - hansdiha (sl) - trr(p) - 21.712 tkm, (d) bhagalpur - jamalpur (up & dn) - tsr(p) - 23.01 tkm, (e) malda division - tsr(p) - 9.585 tkm, (f) bhagalpur - kiul & bhagalpur - dumka - ttr (tws + wcmsc) - 80 sets (1 in 12 - 77 sets and 1 in 8.5 - 3 sets), (g) azimganj - new farakka - t
Read moreA)kalyan - karjat & karjat - panvel - tsr(p) - 29.635 tkm (project id no.01.02.31.26.3.51.003)b)kalyan - karjat -trr(p) - 22.784 tkm & ctr(p) - 0.997 tkm & karjat - panvel - trr(p) - 0.718 tkm & ctr(p) - 3.731 tkm. (project id no.01.02.31.26.3.51.001)c)kalyan -karjat -twr-4.900 tkm (project id no. 01.02.31.26.3.51.037)d)kjt - lnl - replacement of sej with twsej - 7 nos. & kyn - kjt - replacement of sej with twsej -18 nos.(project id no. 01.02.31.26.3.51.038)e) neral - mathe
A)kalyan - karjat & karjat - panvel - tsr(p) - 29.635 tkm (project id no.01.02.31.26.3.51.003)b)kalyan - karjat -trr(p) - 22.784 tkm & ctr(p) - 0.997 tkm & karjat - panvel - trr(p) - 0.718 tkm & ctr(p) - 3.731 tkm. (project id no.01.02.31.26.3.51.001)c)kalyan -karjat -twr-4.900 tkm (project id no. 01.02.31.26.3.51.037)d)kjt - lnl - replacement of sej with twsej - 7 nos. & kyn - kjt - replacement of sej with twsej -18 nos.(project id no. 01.02.31.26.3.51.038)e) neral - mathe
Read moreA)schedule for karjat yard improvement. (project id 01.02.31.25.3.10.046) (cp 415) b)karjat-lonavala:- tsr(p) - 12.930 tkm and ctr(p) -1.840 tkm.(project id 01.02.31.26.3.51.011) c)kalyan lonavala - tbr- 3.50 tkm, tfr 24.903 tkm and tfr(r) - 7.197 tkm ( project id 01.02.31.26.3.51.029 d)kalyan lonavala - casual renewal of sleepers - 6.900 tkm and casual renewal of rails - 1.675 tkm.(project id 0102.31.26.3.51.002) e)karjat lonavala- trr(p)- 17.320 tkm and ctr(p) - 0.500 tkm.( project id 01.02.
A)schedule for karjat yard improvement. (project id 01.02.31.25.3.10.046) (cp 415) b)karjat-lonavala:- tsr(p) - 12.930 tkm and ctr(p) -1.840 tkm.(project id 01.02.31.26.3.51.011) c)kalyan lonavala - tbr- 3.50 tkm, tfr 24.903 tkm and tfr(r) - 7.197 tkm ( project id 01.02.31.26.3.51.029 d)kalyan lonavala - casual renewal of sleepers - 6.900 tkm and casual renewal of rails - 1.675 tkm.(project id 0102.31.26.3.51.002) e)karjat lonavala- trr(p)- 17.320 tkm and ctr(p) - 0.500 tkm.( project id 01.02.
Read moreBonding & measurement of contact wire height after engineering track machine working in connection with ctr (p), trr (p), tbr (p), tsr (p) & tftr under nagpur division of central railway.
Bonding & measurement of contact wire height after engineering track machine working in connection with ctr (p), trr (p), tbr (p), tsr (p) & tftr under nagpur division of central railway.
Read moreElectrical trd portion of works in connection with 1) daund - wadi tftr-3.00km. 2) solapur division-ttr(tsr) - 35nos (1 in 12-29 & 1 in 8.5-6) & ttr (tws+wcms) - 29nos.(1 in 12-4 & 1 in 8.5-25set). 3) daund - wadi - tbr - 57.80km. 4) solapur - wadi - tsr(p) - 24.61km. 5) daund - wadi - trr (p)-22.40km 6) solapur division - ctr(p) - 8.042tkm, trr(p) - 6.816tkm & trr(s) - 2.95tkm (passenger running loop lines) 7) daund - wadi (up) - twr - 8.800tkm. 8) daund - wadi tsr(p) - 31.3 7
Electrical trd portion of works in connection with 1) daund - wadi tftr-3.00km. 2) solapur division-ttr(tsr) - 35nos (1 in 12-29 & 1 in 8.5-6) & ttr (tws+wcms) - 29nos.(1 in 12-4 & 1 in 8.5-25set). 3) daund - wadi - tbr - 57.80km. 4) solapur - wadi - tsr(p) - 24.61km. 5) daund - wadi - trr (p)-22.40km 6) solapur division - ctr(p) - 8.042tkm, trr(p) - 6.816tkm & trr(s) - 2.95tkm (passenger running loop lines) 7) daund - wadi (up) - twr - 8.800tkm. 8) daund - wadi tsr(p) - 31.3 7
Read moreVarious track works such as trr(p) = 5.517 tkm, ttr(tsr) = 37 sets (1 in 12 -36 sets & 1 in 8.5 -1 set) , ttr (fs+tws+wcmsc)= 2 sets (1 in 12) , ttr(wcmsc) = 1 set (1 in 12) & tbr(manual) = 9.866 tkm in the jurisdiction of sr. den- v/lko. (estt. no. 135-2025, 175-2026, 170-2026, 164-2026 & 176-2026)
Various track works such as trr(p) = 5.517 tkm, ttr(tsr) = 37 sets (1 in 12 -36 sets & 1 in 8.5 -1 set) , ttr (fs+tws+wcmsc)= 2 sets (1 in 12) , ttr(wcmsc) = 1 set (1 in 12) & tbr(manual) = 9.866 tkm in the jurisdiction of sr. den- v/lko. (estt. no. 135-2025, 175-2026, 170-2026, 164-2026 & 176-2026)
Read moreA.ohe work in connection with sitamarhi(smi)-raxaul(rxl) section- adx yd.-trr(p) in passenger running loops of adapur yard line no- 04 by 60 kg new rails = 0.9 tkm .b.ohe work in connection with rgh yd. -ctr(p) in passenger running loops of ramgarhwa yard (rgh) line no- 01 by 60 kg (1175 ht) rail on 60 kg psc sleeper - 0.9 tkm .c.ohe modification work in connection with raxaul yd. -ctr(s) in passenger running loops of raxaul yard (rxl) line no- 06 by 60 kg (sh) rail
A.ohe work in connection with sitamarhi(smi)-raxaul(rxl) section- adx yd.-trr(p) in passenger running loops of adapur yard line no- 04 by 60 kg new rails = 0.9 tkm .b.ohe work in connection with rgh yd. -ctr(p) in passenger running loops of ramgarhwa yard (rgh) line no- 01 by 60 kg (1175 ht) rail on 60 kg psc sleeper - 0.9 tkm .c.ohe modification work in connection with raxaul yd. -ctr(s) in passenger running loops of raxaul yard (rxl) line no- 06 by 60 kg (sh) rail
Read moreGorakhpur mech. w/shop & store depot - ctr(s) - 9.669 tkm, trr(s) - 1.141 tkm & tsr(s) - 0.886 tkm
For complete deion and other details, please refer to tender
Read moreThrough fitting renewal (tfr) and other track works in the section of sr.den-iv/umb in c/w sanctioned works of trr(p) - 40.575 tkm, ctr(p) - 3.917tkm, trr(p) - 10.254 & tsr(p) - 0.689 tkm, ctr(p) - 22.939 tkm, trr(p) - 82.179 tkm, ctr(p) - 2.910 tkm and tsr(p) - 14.054 tkm.
For complete deion and other details, please refer to tender
Read moreof your Industry type