Mtps I Tm I Unit Iv Inspection And Overhauling Of Oil Vapour Extraction Fan Assembly And Renewal Of Gaskets Of Turbine Lub Oil Line Valves Nr Vs And Existing Worn Out Cooling Water Pipe Line Of Inlet Outlet And Vent Pipes Of Tloc Soc Ac Lop
|
Description |
Mtps I Tm I Unit Iv Inspection And Overhauling Of Oil Vapour Extraction Fan Assembly And Renewal Of Gaskets Of Turbine Lub Oil Line Valves Nr Vs And Existing Worn Out Cooling Water Pipe Line Of Inlet Outlet And Vent Pipes Of Tloc Soc Ac Lop
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 6200 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link |
AAAAAAAAAA Login to view |
Start Date | May 14, 2025 23:30 |
End Date |
28/05/2025 ( 13 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Mtps i tm i unit iv inspection and overhauling of oil vapour extraction fan assembly and renewal of gaskets of turbine lub oil line valves nrvs and existing worn out cooling water pipe line of inlet outlet and vent pipes of tloc soc ac lop
Read moreMtps tm unit i cleaning and painting of and outer portion of receiver tanks of 1 2 for instrument air and service air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type airdrie
Mtps tm unit i cleaning and painting of and outer portion of receiver tanks of 1 2 for instrument air and service air and renewal of manhole door gaskets and overhauling of safety valves of receiver tanks overhauling of silica gel type air drie
Read moreMtps i tm unit i cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets
Mtps i tm unit i cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets
Read moreMtpsi tm unit i renewal of piston seal piston rod packing in hp lp bypass valves and its spray valves actuators including servicing of oil filters during aoh of 2025 26
Mtpsi tm unit i renewal of piston seal piston rod packing in hp lp bypass valves and its spray valves actuators including servicing of oil filters during aoh of 2025 26
Read moreMtps i bm unit i aoh 2025 26 cutting and patch welding on the eroded portion of the fg duct from eco outlet to aph inlet renewal of support beam both inlet and allied works
Mtps i bm unit i aoh 2025 26 cutting and patch welding on the eroded portion of the fg duct from eco outlet to aph inlet renewal of support beam both inlet and allied works
Read moreMtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Mtps i tm unit i removal and reinsulation of hp ip control valve area spindle leak off lines gland steam pipes of lp front rear in main turbine during annual maintenance work 2025 26
Read moreMtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i
Mtps i mi ca cws i cooling tower i overhauling of flow control valves and including reconditioning of worn out spares during aoh 2025 2026 of unit i
Read moreMtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreMtps i tm 210mw lmw design turbine dismantling inspection and overhauling of speeder gear assembly of governing system
Mtps i tm 210mw lmw design turbine dismantling inspection and overhauling of speeder gear assembly of governing system
Read moreMtps i ca cws i complete dismantling inspection overhaul and renewal of pump components in 1 no cooling water pump of capacity 16000 m3 hr single stage vmf model 1175 kw motor in stage i
Mtps i ca cws i complete dismantling inspection overhaul and renewal of pump components in 1 no cooling water pump of capacity 16000 m3 hr single stage vmf model 1175 kw motor in stage i