Tender Details
Particulars | Details |
---|---|
Title |
Mtps I Tm I Unit Ii Inspection And Overhauling Of Oil Vapour Extraction Fan Assembly And Renewal Of Gaskets Of Turbine Lub Oil Line Valves Nr Vs And Existing Worn Out Cooling Water Pipe Line Of Inlet Outlet And Vent Pipes Of Tloc Soc Ac Lop
|
Description |
Mtps I Tm I Unit Ii Inspection And Overhauling Of Oil Vapour Extraction Fan Assembly And Renewal Of Gaskets Of Turbine Lub Oil Line Valves Nr Vs And Existing Worn Out Cooling Water Pipe Line Of Inlet Outlet And Vent Pipes Of Tloc Soc Ac Lop
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_456492_1 |
Reference Number |
CE / MTPS-I / SE / M-I / TM / OT. 28 / 2024-25 |
Tender Fee | 0 |
EMD | 5000 |
Tender Value | |
Place | Mettur Thermal Power Station-I / Mettur Dam |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=542860 |
Start Date | June 21, 2024 22:30 |
End Date |
05/07/2024 ( Expired 291 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Mtps i tm i removal and re insulation of hp ip control valves gland steam pipes esviv and hptipt transfer pipe lines during breakdown maintenance work of main turbine in unit i to iv for the period of one year during 2025 26 as and when required
Read moreMtps i tm 210mw lmw design turbine dismantling inspection and overhauling of speeder gear assembly of governing system
Mtps i tm 210mw lmw design turbine dismantling inspection and overhauling of speeder gear assembly of governing system
Read moreMtps i ca cws i complete dismantling inspection overhaul and renewal of pump components in 1 no cooling water pump of capacity 16000 m3 hr single stage vmf model 1175 kw motor in stage i
Mtps i ca cws i complete dismantling inspection overhaul and renewal of pump components in 1 no cooling water pump of capacity 16000 m3 hr single stage vmf model 1175 kw motor in stage i
Read moreMtps i mill plant unit ii complete dismantling of mill internals reconditioning renewal of worn out parts renewal of worn out vertical shaft and renewal of worm gear hub mill bottom etc in mill 2a of unit ii
Mtps i mill plant unit ii complete dismantling of mill internals reconditioning renewal of worn out parts renewal of worn out vertical shaft and renewal of worm gear hub mill bottom etc in mill 2a of unit ii
Read moreMtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit
Mtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit
Read moreProcurement of various high pressure nrvs and valves for various pumps, auxiliaries and turbine steam drain line of unit no. 1 to 4, ph i and ii, at sgtps, mppgcl, birsinghpur.
Procurement of various high pressure nrvs and valves for various pumps, auxiliaries and turbine steam drain line of unit no. 1 to 4, ph i and ii, at sgtps, mppgcl, birsinghpur.
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in mill 1d
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom in mill 1d
Read moreMtps-i m ii oahs renewal of existing heavily worn out eroded and punctured bends and worn out ms spool pieces by fabrication and fixing of bends
Mtps-i m ii oahs renewal of existing heavily worn out eroded and punctured bends and worn out ms spool pieces by fabrication and fixing of bends
Read moreMtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit
Mtps i tm ii unit i complete inspection and reconditioning of axial piston pump of hp lp bypass system oil supply unit
Read moreMtps i tm unit ii overhauling of crh nrvs es 18 19 and inspection of flash tank i to condenser connected metallic expansion bellow e6 during unit ii coh and rla study works 2024
Mtps i tm unit ii overhauling of crh nrvs es 18 19 and inspection of flash tank i to condenser connected metallic expansion bellow e6 during unit ii coh and rla study works 2024
Read moreof your Industry type