Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Widening And Strengthening Work Of Meharma Bypass Ing From Sidhokanho Chowk To Meet At Ch. 11.2 At Meharma From Km 9.300 To Km 11.200 Of Nh 133 (Total Length 1.710 Km)
|
| Description |
Widening And Strengthening Work Of Meharma Bypass Ing From Sidhokanho Chowk To Meet At Ch. 11.2 At Meharma From Km 9.300 To Km 11.200 Of Nh 133 (Total Length 1.710 Km)
|
| Organisation | RCD EinC | State Govt. and UT |
| Tender Id | 2025_CECOM_98361_1 |
|
Reference Number |
NH/DEOGHAR/SBD/02/2024-25 (3rd Call) |
| Tender Fee | 10000 |
| EMD | 5 Lakh |
| Tender Value | |
| Place | Km 9.300 to Km 11.200 of NH-133 |
| Link |
View Original Tender Notice
https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=132220 |
| Start Date | February 10, 2025 18:00 |
| End Date |
Expired
24/02/2025
Expired 493 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Strengthening and reconstruction of nh-6 (spur) from km 0.00 to km 38.80 in the state of mizoram
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreWidening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500.
Widening and strengthening of road from sh-94 to rawla ph-1 rawla rojhri road km. 0/0 to 2/500
Read moreRemaining work of widening and strengthening of dhanawa dablana bhawanipura ranipura bansi nainwa on mdr-183 km. 0/0 to 45/0 (mdr-183)
Remaining work of widening and strengthening of dhanawa dablana bhawanipura ranipura bansi nainwa on mdr-183 km. 0/0 to 45/0 (mdr-183)
Read moreEngagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Engagement of user fee agency through e-tender at mohana toll plaza at km 58.035 for the project four laning of gohana-sonepat section of nh-352a (pkg-ii) from km 40.601 to km 78.837 (length 38.236 km) in the state of haryana
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreStrengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp
Strengthening peridic renewal and maintenance of existing national highway nh154 from km 100840 to chauntra at km 140625 of pathankot mandi corridor in the state of hp
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreWidening and strengthening work of meharma bypass ing from sidhokanho chowk to meet at ch. 11.2 at meharma from km 9.300 to km 11.200 of nh-133 (total length- 1.710 km).
Widening and strengthening work of meharma bypass ing from sidhokanho chowk to meet at ch. 11.2 at meharma from km 9.300 to km 11.200 of nh-133 (total length- 1.710 km).
Read moreWidening and strengthening work of meharma bypass ing from sidhokanho chowk to meet at ch. 11.2 at meharma from km 9.300 to km 11.200 of nh-133 (total length- 1.710 km)
Widening and strengthening work of meharma bypass ing from sidhokanho chowk to meet at ch. 11.2 at meharma from km 9.300 to km 11.200 of nh-133 (total length- 1.710 km)
Read moreof your Industry type