Tender Details

Particulars Details
Title
Repairing Of 24 Nos. Roller Rails Of 24/96 Dragline And Repairing Of Old/Worn Out Rollers And Fabrication Of Cages Pertaining To Live Ring Assembly Of 24/96 Draglines At Ncl Jayant Project
Description
Repairing Of 24 Nos. Roller Rails Of 24/96 Dragline And Repairing Of Old/Worn Out Rollers And Fabrication Of Cages Pertaining To Live Ring Assembly Of 24/96 Draglines At Ncl Jayant Project
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2025_NCL_335562_1
Reference
Number
JNT/GM(Excv)/E-tender/25-26/01
Tender Fee 0
EMD 87800
Tender Value
Place Jayant Project
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=347855
Start Date May 17, 2025 15:00
End Date

02/06/2025 ( Expired 29 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
One time gas charging and maintenance of 4 nos. cabin air conditioner of both 24/96 dragline (krishna and balram) of 20/90 dragline working at nigahi project

One time gas charging and maintenance of 4 nos. cabin air conditioner of both 24/96 dragline (krishna and balram) of 20/90 dragline working at nigahi project

Read more
Repair, fabrication and erection of old, worn-out and damaged delivery pipe line from water to 27 meter level in hydro cyclone section of kathara washery

Repair, fabrication and erection of old, worn-out and damaged delivery pipe line from water to 27 meter level in hydro cyclone section of kathara washery

Read more
Repairing/rehabilitation of 03 nos. telescopic lighting tower at east, west and coal section for ob/coal face illumination and 02 nos high mast tower dismantling and erection at west section and bws workshops of jayant, ncl.

Repairing/rehabilitation of 03 nos. telescopic lighting tower at east, west and coal section for ob/coal face illumination and 02 nos high mast tower dismantling and erection at west section and bws workshops of jayant, ncl.

Read more
Replacement of worn out undercarriage assembly with new one including track chain, idler assembly, sprocket segment, track roller, fastener and carrier roller of 05 nos. cat d11t dozer (cat1, cat2, cat3, cat4 and cat5) and 02 nos. komatsu d475a5

Replacement of worn out undercarriage assembly with new one including track chain, idler assembly, sprocket segment, track roller, fastener and carrier roller of 05 nos. cat d11t dozer (cat1, cat2, cat3, cat4 and cat5) and 02 nos. komatsu d475a5

Read more
Annual maintenance contract for repair and maintenance of 02 nos. industrial air conditioners (25 kw, sunbeam make) fitted in pcr unit of 02 nos. 24/96 dragline (krishna and balram dragline) working at nigahi project, ncl for a period of one year.

Annual maintenance contract for repair and maintenance of 02 nos. industrial air conditioners (25 kw, sunbeam make) fitted in pcr unit of 02 nos. 24/96 dragline (krishna and balram dragline) working at nigahi project, ncl for a period of one year.

Read more
A.transportation of 01 no. of defunct tg-unit-3, 02 nos. of old, obsolete tr, it accessories after dismantling from powerhouse to hydro museum premises near forebay tank and re-assembling the same and carrying out other necessary works at shp.

A.transportation of 01 no. of defunct tg-unit-3, 02 nos. of old, obsolete tr, it accessories after dismantling from powerhouse to hydro museum premises near forebay tank and re-assembling the same and carrying out other necessary works at shp.

Read more
One time gas charging and maintenance of 8 (eight) no. air-conditioners in operator cabins and co-operator cabins of 3 (three) nos. 24/96 and 1 (one) no. 15/90 dragline at jayant project.

One time gas charging and maintenance of 8 (eight) no. air-conditioners in operator cabins and co-operator cabins of 3 (three) nos. 24/96 and 1 (one) no. 15/90 dragline at jayant project.

Read more
Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit 201 belt conveyor and refitting of all its accessories at moonidih coal washery.

Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit 201 belt conveyor and refitting of all its accessories at moonidih coal washery.

Read more
Replacement of worn out roof sheet of old ups sheds 03 nos. and raising of height of existing ups sheds 03 nos. over the span of total area of 60x32 at govt. super specialty hospital, jammu

Replacement of worn out roof sheet of old ups sheds 03 nos. and raising of height of existing ups sheds 03 nos. over the span of total area of 60x32 at govt. super specialty hospital, jammu

Read more
(a)new winding of 07 nos. vibrator transformer and new core changing volt input 220v, 2.17amp to volt output 440v, 12.5amp of rcb 00 and (b) repairing of 24 no. plate rectifier unit 24 amp for vibrator ing panel at rcb 00 out of 32 nos. vibrator

(a)new winding of 07 nos. vibrator transformer and new core changing volt input 220v, 2.17amp to volt output 440v, 12.5amp of rcb 00 and (b) repairing of 24 no. plate rectifier unit 24 amp for vibrator ing panel at rcb 00 out of 32 nos. vibrator

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise