Tender Details

Particulars Details
Title
Repairing Of Worn Out 60 Nos. Rollers And Fabrication Of 10 Nos. Roller Sector Cage (10 Nos. And 10 Nos. Outer) Pertaining To Live Ring Assembly Of 24/96 Draglines Of Bina Project.
Description
Repairing Of Worn Out 60 Nos. Rollers And Fabrication Of 10 Nos. Roller Sector Cage (10 Nos. And 10 Nos. Outer) Pertaining To Live Ring Assembly Of 24/96 Draglines Of Bina Project.
Organisation Northern Coalfields Limited | Public Sector Undertakings
Tender Id 2024_NCL_315923_1
Reference
Number
Bina/SO(Excv)/Tender/24-25/41 dt 26.08.2024
Tender Fee 0
EMD 34800
Tender Value
Place Bina Project, NCL
Link https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=327424
Start Date August 27, 2024 14:30
End Date

06/09/2024 ( Expired 251 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing/rebuilding and line boring of 08 nos. cracked/ worn out lift cylinder rear pin housing (02 nos. per machine) of 10 cum cat992k payloader (sl. no. 500293, 500298, 500300 and 500302) working at kocp

Repairing/rebuilding and line boring of 08 nos. cracked/ worn out lift cylinder rear pin housing (02 nos. per machine) of 10 cum cat992k payloader (sl. no. 500293, 500298, 500300 and 500302) working at kocp. scope of work as per tender documents.

Read more
Repairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.

Repairing and line boring of 04 nos. worn-out bucket eyes and repair welding/shaping of rhs bucket eye housing on the front part of bucket to make the bucket assembly serviceable/ready in float for be1800e shovel at dep.

Read more
Offloading work to outside agency for repairing and vulcanization of 80 nos trailing cable joints on as and when required basis during 2 years duration in 24 96 draglines of dudhichua project

Offloading work to outside agency for repairing and vulcanization of 80 nos trailing cable joints on as and when required basis during 2 years duration in 24 96 draglines of dudhichua project

Read more
Offloading the work for repairing of railpath cracks replacement and tightening of barrel bolts and joint studs and replacement of railsegment and live ring assy in 24 96 vindhya dragline of dudhichua project

Offloading the work for repairing of railpath cracks replacement and tightening of barrel bolts and joint studs and replacement of railsegment and live ring assy in 24 96 vindhya dragline of dudhichua project

Read more
Complete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.

Complete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.

Read more
Repairing replacement of steering clutch assembly both sides denting of operator cabin fabrication of upper carrier roller foundation 03 nos along with repairing of end bit and cutting edge of blade assembly of dozer sl no 11900 make beml model bd355

Repairing replacement of steering clutch assembly both sides denting of operator cabin fabrication of upper carrier roller foundation 03 nos along with repairing of end bit and cutting edge of blade assembly of dozer sl no 11900 make beml model bd355

Read more
Repairing / rebuilding of 02 nos. dump pulley and fitment of its sub-assembly for commissioning of these dump pulleys of 24/96 saurabh dragline, working at bina project.

Repairing / rebuilding of 02 nos. dump pulley and fitment of its sub-assembly for commissioning of these dump pulleys of 24/96 saurabh dragline, working at bina project.

Read more
Repairing of base assembly of 24/96 gaurav dragline by changing of worn out and damaged plates by new plates of sizes (20mm to 25mm).

Repairing of base assembly of 24/96 gaurav dragline by changing of worn out and damaged plates by new plates of sizes (20mm to 25mm).

Read more
Repairing/rebuilding of worn out housing of arm(02 no.), boom (02 nos. ) boom cylinder foot pin ( 02 nos.), arm cylinder eye (04 nos.), boom foot housing (02 no.) and bucket cylinder eye (02 nos.) and then co-axial line boring to its original size i

Repairing/rebuilding of worn out housing of arm(02 no.), boom (02 nos. ) boom cylinder foot pin ( 02 nos.), arm cylinder eye (04 nos.), boom foot housing (02 no.) and bucket cylinder eye (02 nos.) and then co-axial line boring to its original size i

Read more
Repairing / rebuilding of 8 nos. worn out bucket of 24/96 draglines and 3 nos. worn out bucket of 10/70 draglines, working at bina project.

Repairing / rebuilding of 8 nos. worn out bucket of 24/96 draglines and 3 nos. worn out bucket of 10/70 draglines, working at bina project.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise