Tender Details

Particulars Details
Title
Dc Of Twin Tunnel By Shield Tbm, Cc Tunnel Box, And Four Underground Stations With Entry/Exits, Af, Ws, Si And Drainage Works From Chainage Ch 7629.531 M To Ch 11700.00 M (Dn Line) Of Inderlok Indraprastha Corridor Of Delhi Mrts Project Of Phase Iv
Description
Dc Of Twin Tunnel By Shield Tbm, Cc Tunnel Box, And Four Underground Stations With Entry/Exits, Af, Ws, Si And Drainage Works From Chainage Ch 7629.531 M To Ch 11700.00 M (Dn Line) Of Inderlok Indraprastha Corridor Of Delhi Mrts Project Of Phase Iv
Organisation Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department
Tender Id 2025_DMRC_886569_1
Reference
Number
D2C-07
Tender Fee 23600
EMD 17.65 Crore
Tender Value -
Place New Delhi
Link
View Original Tender Notice

https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=931878

Start Date January 05, 2026 14:30
End Date
Expired 12/01/2026

Expired 273 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dc of twin tunnel (up and down lines) by shield tbm along with four underground stations including their connecting subways, associated entry/exits, etc., for the central vista corridor under phase-v(a) project of delhi mrts.

Dc of twin tunnel (up and down lines) by shield tbm along with four underground stations including their connecting subways, associated entry/exits, etc., for the central vista corridor under phase-v(a) project of delhi mrts.

Read more
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.

Read more
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Read more
Design and construction of twin tunnel by shield tbm, tunnel by cut and cover, underground ramp at mithapur and three underground metro including architectural finishing, ws, si and dw of stations of phase-i of patna mrts.

Design and construction of twin tunnel by shield tbm, tunnel by cut and cover, underground ramp at mithapur and three underground metro including architectural finishing, ws, si and dw of stations of phase-i of patna mrts.

Read more
Design and construction of twin tunnel by shield tbm, tunnel by cut and cover, underground ramp at rukanpura and three underground metro stations including architectural finishing, ws, si and dw of stations of phase-i of patna mrts.

Design and construction of twin tunnel by shield tbm, tunnel by cut and cover, underground ramp at rukanpura and three underground metro stations including architectural finishing, ws, si and dw of stations of phase-i of patna mrts.

Read more
design and construction of single tunnel (subway) between bihar and patna museum by shield tbm, fire escapes, ancillary building, entry/exits building including architectural finishing, water supply, sanitary installation and drainage works at patna

design and construction of single tunnel (subway) between bihar and patna museum by shield tbm, fire escapes, ancillary building, entry/exits building including architectural finishing, water supply, sanitary installation and drainage works at patna

Read more
Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.

Design, supply, installation, testing and commissioning of 25 kv overhead equipment (ohe) for elevated corridor of line-10 (saket g block to sangam vihar) and line-5 ext. (inderlok and ashok park main station) of delhi metro mrts phase-iv.

Read more
Design and construction of elevated viaduct, ramp from chainage ch - 514.012 to ch- 440.000 and one elevated station including afp and pre-engineered steel roof structure and roof sheeting works of delhi mrts phase-iv project.

Design and construction of elevated viaduct, ramp from chainage ch - 514.012 to ch-440.000 and one elevated station including afp and pre-engineered steel roof structure and roof sheeting works of delhi mrts phase-iv project.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise