Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐ Invitation For Tender: Patna Mrts Phase I ๐ The Delhi Metro Rail Corporation Limited, Under The Aegis Of The Central Government's Ministry/Department, Is Seeking Tenders For The Design And Construction Of A Comprehensive Infrastructure Project For Patna Mrts Phase I. ๐ ๏ธ Scope Of Work: Design And Construction Of Twin Tunnel By Shield Tbm Tunnel By Cut And Cover Underground Ramp At Mithapur Three Underground Metro Stations With Architectural Finishing, Ws, Si, And Dw ๐ Tender Submission Deadline: 01/05/2024, 3:00 Pm ๐ฐ Tender Fee: Inr 23,600 ๐ฒ Earnest Money Deposit (Emd): Inr 16.83 Crores Interested Contractors Must Possess The Requisite Expertise And Experience In Large Scale Infrastructure Projects. Detailed Proposals, Including Technical Specifications, Cost Estimates, And Project Timelines, Are To Be Submitted In Accordance With The Tender Documents. Keywords: Patna Mrts, Infrastructure, Tunnel Construction, Metro Stations, Design And Build, Delhi Metro Rail Corporation, Government Tender, Emd, Tender Submission| Particulars | Details |
|---|---|
| Title |
Design And Construction Of Twin Tunnel By Shield Tbm, Tunnel By Cut And Cover, Underground Ramp At Mithapur And Three Underground Metro Including Architectural Finishing, Ws, Si And Dw Of Stations Of Phase I Of Patna Mrts.
|
| Description |
Design And Construction Of Twin Tunnel By Shield Tbm, Tunnel By Cut And Cover, Underground Ramp At Mithapur And Three Underground Metro Including Architectural Finishing, Ws, Si And Dw Of Stations Of Phase I Of Patna Mrts.
|
| Organisation | Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department |
| Tender Id | 2023_DMRC_787442_1 |
|
Reference Number |
- |
| Tender Fee | 23600 |
| EMD | 16.83 Crore |
| Tender Value | - |
| Place | Patna |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=827711 |
| Start Date | October 01, 2024 14:30 |
| End Date |
Expired
08/10/2024
Expired 699 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design and construction of twin tunnel by shield tbm, tunnel by cut and cover, underground ramp at rukanpura and three underground metro stations including architectural finishing, ws, si and dw of stations of phase-i of patna mrts.
Design and construction of twin tunnel by shield tbm, tunnel by cut and cover, underground ramp at rukanpura and three underground metro stations including architectural finishing, ws, si and dw of stations of phase-i of patna mrts.
Read moreDc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.
Read moredesign and construction of single tunnel (subway) between bihar and patna museum by shield tbm, fire escapes, ancillary building, entry/exits building including architectural finishing, water supply, sanitary installation and drainage works at patna
design and construction of single tunnel (subway) between bihar and patna museum by shield tbm, fire escapes, ancillary building, entry/exits building including architectural finishing, water supply, sanitary installation and drainage works at patna
Read moreDc of twin tunnel by shield tbm, cc tunnel box, and four underground stations with entry/exits, af, ws, si and drainage works from chainage ch- 7629.531 m to ch- 11700.00 m (dn line) of inderlok-indraprastha corridor of delhi mrts project of phase-iv
Dc of twin tunnel by shield tbm, cc tunnel box, and four underground stations with entry/exits, af, ws, si and drainage works from chainage ch- 7629.531 m to ch- 11700.00 m (dn line) of inderlok-indraprastha corridor of delhi mrts project of phase-iv
Read moreMaintenance contract for repairing and rehabilitation of tunnel wall, tunnel segments in underground section from bhikaji cama place ramp to sarai kale khan nizamuddin ramp in line-7.
Maintenance contract for repairing and rehabilitation of tunnel wall, tunnel segments in underground section from bhikaji cama place ramp to sarai kale khan nizamuddin ramp in line-7.
Read moreMaintenance contract for repairing and rehabilitation of tunnel wall, tunnel segments in underground section from bhikaji cama place ramp to sarai kale khan nizamuddin ramp in line-7.
Maintenance contract for repairing and rehabilitation of tunnel wall, tunnel segments in underground section from bhikaji cama place ramp to sarai kale khan nizamuddin ramp in line-7.
Read more350/mpmrcl/2024/in05 design and construction of twin tunnel up and down by shield tbm, cut and cover, cross passages with or without sump, ramps, seven underground stations
Package in 05 design and construction of twin tunnel up and down by shield tbm, cut and cover, cross passages with or without sump, ramps, seven ug stations including architectural finishing, plumbing as directed by engineer for ug section of indore
Read more569/mpmrcl/2024/in05r design and construction of twin tunnel up and down by shield tbm, cut and cover, cross passages with or without sump, ramps, seven underground stations
Package in 05 design and construction of twin tunnel up and down by shield tbm, cut and cover, cross passages with or without sump, ramps, seven ug stations including architectural finishing, plumbing as directed by engineer for ug section of indore
Read moreRectification of leakage/seepage in tunnel and underground structure from mandi house ramp to rajiv chowk ramp of line 3 and link line of line-3
Rectification of leakage/seepage in tunnel and underground structure from mandi house ramp to rajiv chowk ramp of line 3 and link line of line-3
Read moreComprehensive architectural finishing works at four underground stations namely aerocity, mahipalpur, vasant kunj and kishangarh station on aerocity-tughlakabad corridor of phase-iv of delhi mrts.
Comprehensive architectural finishing works at four underground stations namely aerocity, mahipalpur, vasant kunj and kishangarh station on aerocity-tughlakabad corridor of phase-iv of delhi mrts.
Read moreof your Industry type