Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Investigation And Survey (On Gis Basis) Of The Project Area Including Soil Investigation, Engineering (Hydraulic, Structural Design As Required) Procurement Of All Labour, Material, Tn P Etc Construction Works Of Ghaziabad Sewerage Scheme Karhera Zone
|
Description |
Investigation And Survey (On Gis Basis) Of The Project Area Including Soil Investigation, Engineering (Hydraulic, Structural Design As Required) Procurement Of All Labour, Material, Tn P Etc Construction Works Of Ghaziabad Sewerage Scheme Karhera Zone
|
Organisation | Government of Uttar Pradesh |
Tender Id | 2023_UPJNM_812200_1 |
Reference Number |
467/Vivid-13/108 dated 09.06.2023 |
Tender Fee | 23600 |
EMD | 3.84 Crore |
Tender Value | |
Place | O/o the SE Construction Circle UPJN(U) Ghaziabad |
Link | https://etender.up.nic.in |
Start Date | June 15, 2023 23:30 |
End Date |
09/08/2023 ( Expired 683 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Investigation survey on gis basis and construction of 10.20 mld stp with cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc in faridpur npp
Investigation survey on gis basis and construction of 10.20 mld stp with cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Read moreInvestigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc in bisalpur npp
Investigation survey on gis basis and construction of 8 mld stp with 20 kld cotreatment including mps i and d of drains and structure rising main treated effluent line with scada etc
Read moreSurvey design and execution of sewerage scheme dal lake uncovered areas pollution abatement of dal lake uncovered areas kashmir j and k on epc fixed cost turnkey basis incld. operation and maintenance for 5 years after successful completion of free
Survey design and execution of sewerage scheme dal lake uncovered areas pollution abatement of dal lake uncovered areas kashmir j and k on epc fixed cost turnkey basis incld. operation and maintenance for 5 years after successful completion of free
Read moreIssuing of new connections/line construction/line shifting etc. works under deposit scheme on the basis of running contract in the area of eudd jansath, muzaffarnagar
Issuing of new connections/line construction/line shifting etc. works under deposit scheme on the basis of running contract in the area of eudd jansath, muzaffarnagar
Read moreShifting of 11 kv overhead/lt overhead, dt pole installation and other works etc. due to road expansion from brahamand ghat to raskhan samadhi in the area of edd-laxminagar, mathura under deposit scheme on semi turnkey basis
Shifting of 11 kv overhead/lt overhead, dt pole installation and other works etc. due to road expansion from brahamand ghat to raskhan samadhi in the area of edd-laxminagar, mathura under deposit scheme on semi turnkey basis
Read moreInvestigation survey on gis basis and construction of 6 mld stp with cotreatment including mps i and d of drains and structure ips rising main treated effluent line with scada etc
Investigation survey on gis basis and construction of 6 mld stp with cotreatment including mps i and d of drains and structure ips rising main treated effluent line with scada etc
Read moreInvestigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete
Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage &#x0d works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district &#x0d lucknow up india &#x0d
Read moreSurvey, soil investigation, planning, designing, construction and obtaining all relevant permissions and required completion certificate from competent authority on lump-sum turn-key basis for construction of 768 mig t s on plot no r-1,add.midc,latur
Survey, soil investigation, planning, designing, construction and obtaining all relevant permissions and required completion certificate from competent authority on lump-sum turn-key basis for construction of 768 mig t s on plot no r-1,add.midc,latur
Read moreSurvey design and execution of sewerage scheme samba town under pollution abatement of river basanter at samba jkunder nrcp on epc fixed cost basis incl o and m for 5 years after successful completion of free trial of 6 mths. cno sdj/w/76/24-25
Survey design and execution of sewerage scheme samba town under pollution abatement of river basanter at samba jkunder nrcp on epc fixed cost basis incl o and m for 5 years after successful completion of free trial of 6 mths. cno sdj/w/76/24-25
Read moreInvestigation and survey on gis basis of the project area including soil investigation engineering design hydraulic and structural as required procurement of all labour and material t and p etc and construction of various components complete
Construction of 0.6 mld stp pumping station conveyance system and other associated sewerage works and drain works in patelpuram gaytri shaktipeeth, gomti nagar vistar sector1 district lucknow up india
Read moreof your Industry type