Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Electrical Works Related To Renovation Of Toilets Etc. In Health Centre At Hri, Prayagraj
|
Description |
Electrical Works Related To Renovation Of Toilets Etc. In Health Centre At Hri, Prayagraj
|
Organisation | Harish-Chandra Research Institute | Central Govt. Ministry/Department |
Tender Id | 2025_HRI_856301_1 |
Reference Number |
HRI/10/2025 |
Tender Fee | 0 |
EMD | 1700 |
Tender Value | |
Place | HRI, Chhatnag Road Jhunsi, Prayagraj |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=900280 |
Start Date | April 10, 2025 18:30 |
End Date |
21/04/2025 ( Expired 76 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreSitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Sitc for modification/ shifting of works of 11 kv and lt electrical utilities of brpl and dismantling/relocation of high mast and street lights of pwd and other agencies infringing lajpat nagar to saket g block corridor line 11.
Read moreBalance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Balance works of rehabilitation and upgradation of nh-43 (new nh-30) from km 162.120 to km 173.500 length 11.380 km. (keshkal bypass) 4-lane with paved shoulder in the state of chhattisgarh under nhdp-iv through epc.
Read moreConstruction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Construction of rcc tunnels, precast pedestals for llw pipe line in frfcf and bhavini premises and other associated works at kalpakkam
Read moreLt/b885-078-pm-t-9801/1001 - coke drum replacement, allied modernization and piping works in delayed coker unit of panipat refinery at iocl, panipat
Coke drum replacement, allied modernization and piping works in delayed coker unit of panipat refinery at iocl, panipat
Read moreof your Industry type