Tender Details
Particulars | Details |
---|---|
Title |
Construction Of External And Internal Rcc Drain And Box Culvert At I.A. Masuri Gulawathi Road (Phase I, Ii And Iii) Distt Hapur. (Aiim 3) On Epc Basis
|
Description |
Construction Of External And Internal Rcc Drain And Box Culvert At I.A. Masuri Gulawathi Road (Phase I, Ii And Iii) Distt Hapur. (Aiim 3) On Epc Basis
|
Organisation | UP STATE INDUSTRIAL DEVELOPMENT CORPORATION | State Govt. and UT |
Tender Id | 2024_SIDC_983516_1 |
Reference Number |
CD-I (183) Dt. 19.11.2024 |
Tender Fee | 5000 |
EMD | 1.21 Crore |
Tender Value | |
Place | Hapur |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1731908 |
Start Date | December 14, 2024 16:30 |
End Date |
03/01/2025 ( Expired 137 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreRectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreSupply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Supply, installation, testing and commissioning of electrical panels, cables and construction of rcc trenches for functionality of phase-i technical labs at barc near visakhapatnam, a.p.
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreImprov and upgrad of nh734 sec of moradabad thakurdwara kashipur includ moradabad n kashipur bypass on epc basis in up n uttarakhand pkg iii kashipur bypass l14.490 km starts ch.38.770 and ends at ch.53.260 ch.05.560 of nh309
Improv and upgrad of nh734 sec of moradabad thakurdwara kashipur includ moradabad n kashipur bypass on epc basis in up n uttarakhand pkg iii kashipur bypass l14.490 km starts ch.38.770 and ends at ch.53.260 ch.05.560 of nh309
Read moreZone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Zone no. 03, ward no. 12, (1) construction of rcc drain from pappu kushwaha ji house to naigadhi house at bajarang nagar and (2) construction of rcc drain and pcc road from beside of singhal nurshing home to late ramadhar patel ji house at bara.
Read moreConstruction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Construction of 2 no. of grade separated interchanges at km 113.730 (ranchi-hazaribagh road) and km 139.225 (ranchi-jamshedpur road) on 4 laning stretch of ranchi bypass of nh-33 in jharkhand on epc mode under nh(o).(total length 6.06 km)-2nd call
Read moreConstruction of cc road and rcc drain at ward no 21 anoop gour to rajkumar khandelwal house municipal council narmadapuram mp.
Construction of cc road and rcc drain at ward no 21 anoop gour to rajkumar khandelwal house municipal council narmadapuram mp.
Read moreof your Industry type