Tender Details

Particulars Details
Title
M O Work Pertaining To Completed Closed Scheme Dwarka Zone
Description
Rmo Of 320 Kva And 82.5 Kva Dg Sets Storm Water Pump Sets Fire Fighting Pump Sets Fire Alarm System Mechanical Ventilation System Lift Pressurization System And Rescue Operators For Lifts At 352 Ms Two Bed Room Apartment Pocket 03 Sector 19 B Dwarka
Organisation Central Public Procurement Portal 1
Tender Id 2023_DDA_765601_1
Reference
Number
14/EE(E)/ELD-10/DDA/23-24 (Re-Invited)
Tender Fee 0
EMD 52122
Tender Value
Place EE(E)/ELD-10/DDA
Link https://eprocure.gov.in
Start Date August 05, 2023 21:05
End Date

14/08/2023 ( Expired 670 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Ie services during o and m phase for 4l kagvadar-una-kodinar-veraval section of nh8e from km 139.915 to km 222.400 and km 230.00 to km 263.00 on ham and kodinar bypass km 222.40 to km 230.00 on item rate in state of gujarat (pkg-iv, v, vi-a, vi-b)

Read more
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)

Read more
Construction of nala work at in front of divisional commissioner office chaska maska shop to vasundhara apartment in harishankarpuram ward no.58 zone no.13.file no.221/25x3/6.

Construction of nala work at in front of divisional commissioner office chaska maska shop to vasundhara apartment in harishankarpuram ward no.58 zone no.13.file no.221/25x3/6.

Read more
Construction work of m-30 c.c road and rcc drain on both side of the road from anand thakur house to govind rajak house in suhagi under ward number 77

Construction work of m-30 c.c road and rcc drain on both side of the road from anand thakur house to govind rajak house in suhagi under ward number 77

Read more
Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis

Independent engineer services during o and m stage of four-lane zirakpur-parwanoo section of nh-05 (old nh-22) from km. 39.960 to km. 67.550 including pinjore- kalka-parwanoo bypass in the states of pb, hr and hp under nhdp phase-iii a on bot basis

Read more
Construction of c.c. road and drain work at kailash vihar city center airtel office to income tex office ward no. 30 zone no. 11 file no. 207/25x3/6

Construction of c.c. road and drain work at kailash vihar city center airtel office to income tex office ward no. 30 zone no. 11 file no. 207/25x3/6

Read more
O and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode

O and m and other road safety works on muzaffarnagar haridwar sec of nh334 from km 130.500 to km 206.220 in the state of uttar pradesh and uttarakhand on epc mode

Read more
Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5

Construction of mor sagar artificial reservoir and feeder from bisalpur to mor sagar artificial reservoir, including all components with its o and m for a period of 20 years on hybrid annuity model (ercp-11-09-tf-5

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise