Mtc. of road from i) Satchand Bazar to Natun Bazar via Dhanu Chowdhury para (2.50 km). ii) Manu-Srinagar road to Bhuddimangal Para (L-3.600 km) during the year 2025-26/SH-Patch Metalling, Patch carpeting, seal coat and CD (1.00mX1.00m) etc.
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand
- EMD
- ₹29,778
- Tender fee
- ₹1,000
This tender closed on 04 Aug 2025.
Tender details
- Tender ID
- 2025_CEPWD_63837_1
- Reference number
- 12(01)/PNIeT/25-26. 23/DNIeT/EE/SBM/DIVN/25-26
- Organisation
- Chief Engineer, PWD (R and B) | State Govt. and UT
- Location
- Satchand
- Bids open
- 15 Jul 2025, 6:55 PM
- Bids close
- 4 Aug 2025, 12:00 PM
- Tender value
- –
- EMD
- ₹29,778
- Tender fee
- ₹1,000
Source: https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=pag...
Bid on the next mtc. of road from i) Satchand tender
Most bids fail on paperwork. Before the next one opens, we'll check your eligibility and get your registrations, digital signature (DSC) and documents ready.
Similar tenders
-
Mtc. of road from i) Satchand Bazar to Natun Bazar via Dhanu Chowdhury para (2.50 km). ii) Manu-Srinagar road to Bhuddimangal Para (L-3.600 km) during the year 2025-26
SH - Patch Metalling, Patch carpeting, seal coat and CD (1.00mX1.00m) etc. (2nd Call)
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Closed 2 Dec 2025
View tender -
Periodical renewal of Old NH-44 to Mohamoni Para,( L- 2.50 KM) Gardhang Bazar to Lowgang via Rohini Basak Para and Lowgang Das Para
H- WBM-III, Carpeting, Re-carpeting, Toe wall, Drain etc.( 2nd Call).
Chief Engineer, PWD (R and B) | State Govt. and UT · Santirbazar, South Tripura Closed 17 Mar 2025
View tender -
Mtc of road from US road to Kalibazar via Raj Kumar Chowdhury Para, Loban Roaja, Sabroom South Tripura under Satchand Block (L-7.00 Km)
S.H- Patch Metalling, Re-Carpeting and Seal coat etc. during the year 2024-25.(Portion from 4.648 km to 6.061 km). Gr-III
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Sub-Division Closed 2 Jul 2024
View tender -
Mtc. of road from US road to Kalibazar via Raj Kumar Chowdhury Para, Loban Roaja, Sabroom South Tripura under Satchand Block (L-7.00 Km) /
S.H. Patch Metalling, Re-Carpeting and Seal coat etc. during the year 2024-25. (Portion from 4.648 km to 6.061 km). Gr-III.
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Closed 29 Jul 2024
View tender -
Mtc. of road from US road to Kalibazar via Raj Kumar Chowdhury Para, Loban Roaja, Sabroom South Tripura under Satchand Block (L-7.00 Km)
S.H -Patch Metalling, Re-Carpeting and Seal coat etc. during the year 2024-25. (Portion from 4.648 km to 6.061 km). Gr-III. (2nd Call
Chief Engineer, PWD (R and B) | State Govt. and UT · Satchand Sub-Division Closed 20 Aug 2024
View tender -
FDR of road from RS para PMGSY road to Raidasi Para via Gagan Chowdhury para / SH- Patch Metalling, Carpetting, protection work etc. under Kalyanpur Sub-Division, PWD (RandB). (Group-I).
Chief Engineer, PWD (R and B) | State Govt. and UT · Kalyanpur Closed 12 Sep 2024
View tender -
FDR of road from RS para PMGSY road to Raidasi Para via Gagan Chowdhury Para (L-2.60 KM) / SH- Patch Metalling, Carpetting, protection work etc. under Kalyanpur Sub-Division, PWD (RandB). (Group-II)
Chief Engineer, PWD (R and B) | State Govt. and UT · Kalyanpur Closed 12 Sep 2024
View tender -
Periodical Renewal and Development of road from Alashya Bazar to NH-08 via Maukshya para (L-4.50 Km) , road from Rajapur Bazar to Santi para (L-0.70 km) and road from Alashya Bazar to Lalmirah (L-2.50 km) under Special Assistance during the year 2024
SH-GSB , WBM III, Repairs of potholes, Re-carpeting, Carpeting , Drains etc.
Chief Engineer, PWD (R and B) | State Govt. and UT · Santirbazar, South Tripura Closed 17 Feb 2025
View tender -
Strengthening of road from NH-8 to East Karamcherra (Manik Chowdhury Para) under Karamcherra Assembly Constituency (4.90 km)/ Patch grouting and carpeting etc.
Patch grouting and carpeting etc
Chief Engineer, PWD (R and B) | State Govt. and UT · East Karamcherra Closed 5 Feb 2025
View tender -
Approach road for newly constructed RCC foot bridge at Doang Chowdhury Para under Purba Manubankul VC of Rupaichari RD Block under RD Satchand Division during the financial year 2025-26
Approach road
Chief Engineer, Rural Development Department | State Govt. and UT · Executive Engineer RD Satchand Division Closed 27 Jan 2026
View tender