Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Cc Road And Rcc Drain Under Kayakalp Abhiyan 2.0
|
| Description |
Construction Of Cc Road And Rcc Drain Under Kayakalp Abhiyan 2.0
|
| Organisation | Government of Madhya Pradesh |
| Tender Id | 2023_UAD_313637_1 |
|
Reference Number |
1397/29.09.2023 |
| Tender Fee | 5000 |
| EMD | 33500 |
| Tender Value | |
| Place | nagar parishad badi |
| Link |
View Original Tender Notice
https://mptenders.gov.in |
| Start Date | September 30, 2023 23:00 |
| End Date |
Expired
09/10/2023
Expired 1024 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreConstr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Constr impvt of rd btwn km 29.954 to km 54.694 (net length 24.470 km) on keyla tso lake to zingral (taking tangtse as zero) to nhsl specns through epc mode under 51 rcc/50 brtf/ project himank in ut of ladakh
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreDesign, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.
Design, supply, installation and commissioning of double girder eot crane at ferrochrome plant of omc limited, jajpur road, odisha.
Read moreDevelopment of ujjain airport, ujjain madhya pradesh. sh detailed designing engineering, procurement and construction of new domestic terminal building and allied works
Development of ujjain airport, ujjain, madhya pradesh. sh detailed designing, engineering, procurement and construction of new domestic terminal building and allied works
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of cc road and rcc drain at various wards under kayakalp abhiyan 2.0 in gairatganj
Construction of cc road and rcc drain at various wards under kayakalp abhiyan 2.0 in gairatganj
Read moreConstruction of cc road and rcc drain at various wards under kayakalp abhiyan 2.0 in gairatganj
Construction of cc road and rcc drain at various wards under kayakalp abhiyan 2.0 in gairatganj
Read moreUnder kayakalp abhiyan-2.0 scheme, construction of cc road
Under kayakalp abhiyan-2.0 scheme, construction of cc road
Read moreUnder kayakalp abhiyan-2.0 scheme, construction of cc road
Under kayakalp abhiyan-2.0 scheme, construction of cc road
Read moreof your Industry type