Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Dismantling, Overhauling And Re Installation Of 08 Nos. Discharge Gate, Maintenance Gate At Rls Silo I Chp,Dudhichua Project
|
| Description |
Dismantling, Overhauling And Re Installation Of 08 Nos. Discharge Gate, Maintenance Gate At Rls Silo I Chp, Dudhichua Project
|
| Organisation | Coal India Limited (CIL) |
| Tender Id | 2023_NCL_287338_1 |
|
Reference Number |
DCH/EnM/Tender/CHP/23-24/027 |
| Tender Fee | - |
| EMD | 7544 |
| Tender Value | - |
| Place | Office of GM(EnM) Dudhichua Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in |
| Start Date | September 02, 2023 16:30 |
| End Date |
Expired
12/09/2023
Expired 1126 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreDismantling, overhauling and re-installation of 12 no discharge gates, maintenance gates at rls line no1, 2 and 3 in amlohri chp phase-i and phase-ii
Dismantling, overhauling and re-installation of 12 no discharge gates, maintenance gates at rls line no1, 2 and 3 in amlohri chp phase-i and phase-ii
Read moreReplacement of worn-out ss liners of pre-weigh hopper and swing chutes installed at the rapid loading system (rls) of silo-i and silo-ii (mgr side) at chp dudhichua
Replacement of worn-out ss liners of pre-weigh hopper and swing chutes installed at the rapid loading system (rls) of silo-i and silo-ii (mgr side) at chp dudhichua
Read moreRepairing of swing chute and flow control gate assembly at railway side of silo phase-i at chp, dudhichua
Repairing of swing chute and flow control gate assembly at railway side of silo phase-i at chp, dudhichua
Read moreDismantling, repairing, overhauling and fitting of 2 nos firefighting pump, 2 nos etp pump and one no. jockey pump of chp at chp dudhichua
Dismantling, repairing, overhauling and fitting of 2 nos firefighting pump, 2 nos etp pump and one no. jockey pump of chp at chp dudhichua
Read moreDismantling, repairing and assembling with complete overhauling of sump pumps, slurry pumps and heat exchanger pumps installed at chp dudhichua project
Dismantling, repairing and assembling with complete overhauling of sump pumps, slurry pumps and heat exchanger pumps installed at chp dudhichua project
Read moreOverhauling of apron feeder assembly and dismantling and fabrication of crusher discharge and apron discharge chutes installed in chp phase-i at amlohri project
Overhauling of apron feeder assembly and dismantling and fabrication of crusher discharge and apron discharge chutes installed in chp phase-i at amlohri project
Read moreDismantling, repairing, overhauling and fitting of 2 nos. firefighting pump, 2 nos. etp pump and one no. jockey pump at chp dudhichua
Dismantling, repairing, overhauling and fitting of 2 nos. firefighting pump, 2 nos. etp pump and one no. jockey pump at chp dudhichua
Read moreDismantling and erection of conveyor 5c1 discharge chute of chp kakri project
Dismantling and erection of conveyor 5c1 discharge chute of chp kakri project
Read moreof your Industry type