Tender Details

Particulars Details
Title
Reinstatement Of Cc Road Including Supply Of All Materials Labour T And P Etc Required For Proper Completion Of Work Etc At Shyampur Pumping Water Supply Scheme Of Block Doiwala District Dehradun
Description
Reinstatement Of Cc Road Including Supply Of All Materials Labour T And P Etc Required For Proper Completion Of Work Etc At Shyampur Pumping Water Supply Scheme Of Block Doiwala District Dehradun
Organisation MD (Drinking Water) Peyjal Nigam GoUK | State Govt. and UT
Tender Id 2025_MDPEY_79808_1
Reference
Number
Letter No. 172/NIVIDA/03 Dated 31.01.2025
Tender Fee 2950
EMD 90000
Tender Value -
Place Dehradun
Link
View Original Tender Notice

https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=95179

Start Date February 02, 2025 16:30
End Date
Expired 16/02/2025

Expired 608 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Desilting work of bharwara lake including dewatering disposal of silt within nagar nigam lucknow limit including loading and unloading earth movers dumpers, trucks, pumping plants, labour, all equipment etc. required for proper completion of work.

Desilting work of bharwara lake including dewatering disposal of silt within nagar nigam lucknow limit including loading and unloading earth movers dumpers, trucks, pumping plants, labour, all equipment etc. required for proper completion of work.

Read more
Interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.

Interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.

Read more
Survey drawing design checking of design carting of materialsincluding supply of all materials labours and t and p etc for proper completion of underhansidhunga gujarkot gov rural pumping watersupply scheme (remaining works) under nabard

Survey drawing design checking of design carting of materialsincluding supply of all materials labours and t and p etc for proper completion of underhansidhunga gujarkot gov rural pumping watersupply scheme (remaining works) under nabard

Read more
Supply, installation, commission and maintenance of smart drinking water kiosk with cooling tank capacity 500 ltr. including all, material,t and p required for proper completion of work at shahjahanpur of different locations.

Supply, installation, commission and maintenance of smart drinking water kiosk with cooling tank capacity 500 ltr. including all, material,t and p required for proper completion of work at shahjahanpur of different locations.

Read more
Supply, installation, commission and maintenance of smart drinking water kiosk with cooling tank capacity 500 ltr. including all, material, t and p required for proper completion of work at ayodhya of different locations

Supply, installation, commission and maintenance of smart drinking water kiosk with cooling tank capacity 500 ltr. including all, material, t and p required for proper completion of work at ayodhya of different locations

Read more
Construction of rcc channel/interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.

Construction of rcc channel/interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.

Read more
Construction of rcc channel/interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.

Construction of rcc channel/interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.

Read more
Construction of rcc channel/interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.

Construction of rcc channel/interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.

Read more
Execution of teaching work of classes vi to x 07 sections of shivalik uchchatar madhyamik vidyalaya khara-badshahibagh colony through part time teachers peon and chowkidars as required for proper completion of work for 22 months

Execution of teaching work of classes vi to x 07 sections of shivalik uchchatar madhyamik vidyalaya khara-badshahibagh colony through part time teachers peon and chowkidars as required for proper completion of work for 22 months

Read more
Operation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani

Operation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise