Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Reinstatement Of Cc Road Including Supply Of All Materials Labour T And P Etc Required For Proper Completion Of Work Etc At Shyampur Pumping Water Supply Scheme Of Block Doiwala District Dehradun
|
| Description |
Reinstatement Of Cc Road Including Supply Of All Materials Labour T And P Etc Required For Proper Completion Of Work Etc At Shyampur Pumping Water Supply Scheme Of Block Doiwala District Dehradun
|
| Organisation | MD (Drinking Water) Peyjal Nigam GoUK | State Govt. and UT |
| Tender Id | 2025_MDPEY_79808_1 |
|
Reference Number |
Letter No. 172/NIVIDA/03 Dated 31.01.2025 |
| Tender Fee | 2950 |
| EMD | 90000 |
| Tender Value | - |
| Place | Dehradun |
| Link |
View Original Tender Notice
https://uktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=95179 |
| Start Date | February 02, 2025 16:30 |
| End Date |
Expired
16/02/2025
Expired 608 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Desilting work of bharwara lake including dewatering disposal of silt within nagar nigam lucknow limit including loading and unloading earth movers dumpers, trucks, pumping plants, labour, all equipment etc. required for proper completion of work.
Desilting work of bharwara lake including dewatering disposal of silt within nagar nigam lucknow limit including loading and unloading earth movers dumpers, trucks, pumping plants, labour, all equipment etc. required for proper completion of work.
Read moreInterconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.
Interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.
Read moreSurvey drawing design checking of design carting of materialsincluding supply of all materials labours and t and p etc for proper completion of underhansidhunga gujarkot gov rural pumping watersupply scheme (remaining works) under nabard
Survey drawing design checking of design carting of materialsincluding supply of all materials labours and t and p etc for proper completion of underhansidhunga gujarkot gov rural pumping watersupply scheme (remaining works) under nabard
Read moreSupply, installation, commission and maintenance of smart drinking water kiosk with cooling tank capacity 500 ltr. including all, material,t and p required for proper completion of work at shahjahanpur of different locations.
Supply, installation, commission and maintenance of smart drinking water kiosk with cooling tank capacity 500 ltr. including all, material,t and p required for proper completion of work at shahjahanpur of different locations.
Read moreSupply, installation, commission and maintenance of smart drinking water kiosk with cooling tank capacity 500 ltr. including all, material, t and p required for proper completion of work at ayodhya of different locations
Supply, installation, commission and maintenance of smart drinking water kiosk with cooling tank capacity 500 ltr. including all, material, t and p required for proper completion of work at ayodhya of different locations
Read moreConstruction of rcc channel/interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.
Construction of rcc channel/interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.
Read moreConstruction of rcc channel/interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.
Construction of rcc channel/interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.
Read moreConstruction of rcc channel/interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.
Construction of rcc channel/interconnection work to cross muirmill drain including diversion of flow, dewatering and other necessary arrangements as required for proper completion of work as per direction of engineer in charge.
Read moreExecution of teaching work of classes vi to x 07 sections of shivalik uchchatar madhyamik vidyalaya khara-badshahibagh colony through part time teachers peon and chowkidars as required for proper completion of work for 22 months
Execution of teaching work of classes vi to x 07 sections of shivalik uchchatar madhyamik vidyalaya khara-badshahibagh colony through part time teachers peon and chowkidars as required for proper completion of work for 22 months
Read moreOperation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani
Operation and maintenance of servo voltage stabilizer including supply of all material labour. t and p etc required for proper completion of work which has been installed at different tubwells of water supply scheme under ujs haldwani
Read moreof your Industry type